A ranked summary of long-term projects is provided in Table 8.10 . Supporting materials, including planning-level cost assumptions and environmental screening notes, are included in Appendix H.
Table 8.10: Long-Term Projects: Ranked Priority List Prioritized Rank Facility From To
Cost Esti- mate (2025) $27,719,348.86 $54,016,320.00
Project ID Scope
1 2 3 4 5 6 7
Camp Bowie Blvd Camp Bowie Blvd
Hulen St Horne St
Boland St
306
Reconstruct brick pavement roadway
Reconstruct roadway to include pedestrian and lighting enhancements Widen from (3)-lane to (4)-lane divided roadway with pedestrian and shared-use paths Construct a (4)-lane divided roadway with shared-use paths and a single bridge over wetlands, a river, and a flood zone Widen from (2)-lane to (3)-lane with center turn lane Reconstruct four (4)-lane divided roadway
Wellington Rd
115
Meacham Blvd (East) I-35W
N. Beach St
201
$66,188,072.97
Amon-Carter Blvd
W Fork Trinity River Trinity Blvd
212
$43,093,000.00
Bowman Roberts Rd WJ Boaz Rd
Ten Mile Bridge Rd
222 123
$85,083,123.00 $36,766,248.00 $10,921,342.86 $16,451,691.92 $96,526,765.99
Forest Park Blvd Bonds Ranch Rd
IH-30
Fort Worth Trl
Shire Meadow Roundabout Mistletoe Blvd
Blue Mound (FM 156)
108 Widen from (2)-lane to (4)-lane divided roadway
8 9 10 11 13 14 15 16
Leslie Drive
Park Place
228 Construct a (2)-lane divided roadway with pedestrian/ bicycle/technology pathways 304 Reconstruct (4)-lane divided roadway
Marine Creek Pkwy Dottie Lynn Pkwy/ Green Oaks Pkwy Interchange Westport Pkwy
Old Decatur/Angle Loop 820
Dottie Lynn Pkwy/Green Oaks Pkwy @ E Lancaster Ave (SH 180)
202
Construct interchange
$124,000,000.00
IH-35W (North Fwy) Beach St
117
Widen from (2)-lane to (4)-lane divided roadway Construct a (2)-lane roadway, ultimate build is (4)-lane divided roadway Widen from (2)-lane to (4)-lane undivided roadway with a TWLTL
$56,000,072.00
Old Granbury Rd/ Sycamore School Rd
Bryant Irvin Rd
Summerglade St
220
$12,748,611.28
Shelby Rd Cooks Lane John T White
Race St
Forest Hill Dr
119
$28,675,640.00 $63,181,401.93 $15,936,889.41 $29,166,979.04 $42,185,649.11 $19,848,934.70
Brentwood Stair Rd Dottie Lynn Pkwy
206 Widen from (2)-lane to (4)-lane divided roadway 214 Widen from (2)-lane to (4)-lane divided roadway with shared-use paths 204 Widen from (2)-lane to (4)-lane with a at-grade RR crossing 209 Construct a (4)-lane divided roadway
Newport Rd
Racquet Club Dr
17 18 19 20 21 22 23
Risinger Rd
Hemphill St
Technology Blvd Racquet Club Dr
Randol Mill Rd Ten Mile Bridge
Precinct Line Rd
Widen from (2)-lane to (3)-lane undivided roadway with a TWLTL
Bowman Roberts Boat Club Rd (FM 1220)
221
Sycamore School Rd Technology Blvd
Hemphill St
Rosedale Springs
224 Widen from (2)-lane to (4)-lane divided roadway with shared-use paths 204 Widen from (2)-lane to (4)-lane divided roadway with a single bridge over the RR
$10,689,265.55
Risinger Rd
Hemphill St
$42,412,977.36
Widen from (2)-lane to (3)-lane undivided roadway with a TWLTL
Ten Mile Bridge
Boat Club Rd
Samora Ct
216
$175,138,929.76 $71,806,248.37
Risinger Rd
Technology Blvd Crowley Rd (FM 731)
204 Widen from (2)-lane to (4)-lane divided roadway
271
Prioritized Project List & TIP | Fort Worth Master Transportation Plan