Table ES.7 provides a summary of the 2034 investment cycle projects is included in this section, reflecting project limits and improvement types. More detailed documentation and cost information are provided in Appendix H.

Table ES.7: 2034 Investment Cycle Projects Project ID Facility From To 237 Old Denton Rd/ Riverside Dr Westport Pkwy Sawtimber Trl

Investment Cycle Activities

Bond Activities Costs (Escalated to YOE)

Scope

Widen from (2)-lane to (4)-lane divided roadway with shared- use paths Widen from (2)-lane to (3)-lane with center turn lane Widen from (3)-lane to (4)-lane divided roadway with pedestrian and shared-use paths

Design, Construction Design, ROW Design, ROW Design, NEPA, ROW Design, ROW Design, Construction

$23,404,455.86

W. Bailey Boswell Rd

207 Bowman Roberts Rd

WJ Boaz Rd

$8,585,146.99

201

Meacham Blvd I-35W (South Fwy)

N. Beach St

$33,893,761.41

W Fork Trinity River WJ Boaz Rd East Lancaster Ave (SH180)

212 Amon-Carter Extension

Trinity Blvd Construct a (4)-lane divided roadway with shared-use paths and a single bridge over wetlands, a river, and a flood zone

$112,784,754.69

Bowman Roberts Rd Eastchase Pkwy/Dottie Lynn Pkwy

Ten Mile Bridge Rd John T. White Rd

222

Widen from (2)-lane to (3)-lane with center turn lane Reconstruct roadway to include advanced signals, transit queue jumps, continuous shared-use paths, and intersection treatments

$34,984,441.30

202

$162,944,687.71

Table ES.8: 2034 Investment Cycle Forecasted Capacity 2034 Investment Cycle Total Bond Funding Amount $134,171,213.00 Other Source Funding $285,284,668.00 Total Funding Available $419,455,881.00 Total Funding Used $376,597,247.95 Balance $42,858,633.05