A ranked summary of long-term projects is provided in Table ES.9 . Supporting materials, including planning-level cost assumptions and environmental screening notes, are included in Appendix H.

Table ES.9: Long-Term Projects: Ranked Priority List Rank Facility From To

Cost Esti- mate (2025) $27,719,348.86 $54,016,320.00 $66,188,072.97 $43,093,000.00 $85,083,123.00 $36,766,248.00 $10,921,342.86 $16,451,691.92 $96,526,765.99

Project ID

Scope

1

Camp Bowie Blvd Camp Bowie Blvd Meacham Blvd

Hulen St Horne St

Boland St

306

Reconstruct brick pavement roadway

2 3 4 5 6 7 8 9

Wellington Rd

115

Reconstruct roadway to include pedestrian and lighting enhancements Widen from (3)-lane to (4)-lane divided roadway with pedestrian and shared-use paths Construct a (4)-lane divided roadway with shared-use paths and a single bridge over wetlands, a river, and a flood zone

I-35W (North Fwy) N. Beach St

201

Amon Carter Blvd

W Fork Trinity River Trinity Blvd

212 222 123

Bowman Roberts Rd WJ Boaz

Ten Mile Bridge Rd

Widen from (2)-lane to (3)-lane with center turn lane Reconstruct four (4)-lane divided roadway

Forest Park Blvd E. Bonds Ranch Rd

IH-30 (West Fwy) Shire Meadow Roundabout

Fort Worth Trl Blue Mound

108 Widen from (2)-lane to (4)-lane divided roadway

E Leslie Drive

Mistletoe Blvd

Park Place

228 Construct a (2)-lane divided roadway with pedestrian/bicycle/technology pathways

Marine Creek Pkwy Dottie Lynn Pkwy/ Green Oaks Pkwy Interchange Westport Pkwy

Old Decatur/Angle NW Loop 820 Dottie Lynn Pkwy/Green Oaks Pkwy at E. Lancaster Ave (SH 180)

304 Reconstruct (4)-lane divided roadway

10

202

Construct interchange

$124,000,000.00

11

IH-35W (North Fwy) Beach St

117

Widen from (2)-lane to (4)-lane divided roadway

$56,000,072.00

Old Granbury Rd/ Sycamore School Rd

13

Bryant Irvin Rd

Summerglade St

220

Construct a (2)-lane roadway, ultimate build is (4)-lane divided roadway

$12,748,611.28

14 15 16 17 18 19

Shelby Rd Cooks Lane

Race St

Forest Hill Dr

119

Widen from (2)-lane to (4)-lane undivided roadway with a center turn lane

$28,675,640.00 $63,181,401.93 $15,936,889.41 $29,166,979.04 $42,185,649.11 $19,848,934.70 $10,689,265.55 $42,412,977.36 $175,138,929.76 $71,806,248.37

Brentwood Stair Rd Dottie Lynn Pkwy

206 Widen from (2)-lane to (4)-lane divided roadway

John T White Rd Risinger Rd Randol Mill Rd Ten Mile Bridge

Newport Rd Hemphill St

Racquet Club Dr Technology Blvd Racquet Club

214 Widen from (2)-lane to (4)-lane divided roadway with shared-use paths 204 Widen from (2)-lane to (4)-lane with a at-grade RR crossing

Precinct Line Rd

209 Construct a (4)-lane divided roadway

Bowman Roberts Rd FM 1220 (Boat Club Rd Rosedale Springs Ln Sycamore School Rd

221

Widen from (2)-lane to (3)-lane undivided roadway with a center turn lane

20

Hemphill St Risinger Rd

224 Widen from (2)-lane to (4)-lane divided roadway with shared-use paths 204 Widen from (2)-lane to (4)-lane divided roadway with a single bridge over the RR

21

Hemphill St

Technology Blvd

Boat Club Rd (FM 1220)

22 23

Ten Mile Bridge Rd

Samora Ct

216

Widen from (2)-lane to (3)-lane undivided roadway with a center turn lane

Risinger Rd

Technology Blvd Crowley Rd (FM 731)

204 Widen from (2)-lane to (4)-lane divided roadway

ES-27

Executive Summary | Fort Worth Master Transportation Plan