China Pak Golf Estates, Gwadar

720MW Karot hydropower project, started in Mar 2015, to be completed by 2020, cost of $1,5b. Sponsor: China International Water and Electric Corp.

China Pakistan Economic Corridor

870MW Suki kinari hydropower,

Khunjerab

started in Apr 2015, to be completed by 2020. Sponsor: China Gezhouba Group Company Limited, cost of $1,8b.

N36

The largest unilateral Foreign Direct Investment from one nation into another, China Pakistan Economic Corridor (CPEC) is set to catapult Pakistan’s stature as a key global trade and economic hub. Valued at $62 Billion CPEC includes a bouquet of projects, presently under construction, which aims to improve Pakistani infrastructure and to deepen the economic and political ties between China and Pakistan. CPEC aims to create a 2000-mile economic corridor between Gwadar Port to China’s North Western region of Xinjiang through a 2,700 km long highway from Kashgar to Gwadar, railway links for freight trains, oil and gas pipelines and an optical fibre link. The economic impact of CPEC is projected to be in excess of $200 Billion and the project will create over 700,000 new jobs and adding 2.5% to Pakistan’s annual growth rate changing the country’s destiny.

Raikot

Thakot

Karakoram Highway Phase II Thakot-Havelian section, 120km, to start in June 2015, cost of $920m

Abbottabad

M1

Peshawar

Islamabad

SUNEC 50MW wind project, started in Mar 2015, to be completed in Mar 2016. Sponsor: SUNEC Energy, cost of $130m

M2

Lahore

N66

Orange Line Metro Lahore, 27,1km. Sponsor: Govt of Punjab, cost $1,62b

M3

Faisalabad

N5

M4

N50

1,320 MW coal-based at Sahiwal Punjab, started in Mar 2015, to be completed in 2017, cost of $1,6b. Sponsor: Shandong Royal Group, Huaneng Shandong Power Generation

N55

Quetta

Multan

East-Bay Expressway 18,9 km, to start in December 2017, to be completed in 2019, cost of $135m

N6

中国巴基斯坦经济走廊

N26

1,320 MW coal-based project Muzaffargarh cost of $1,9b approx

KHI-LHR motorway Multan-Sukkur section of 387km, will start in June 2015, to be completed by 4th quarter of 2017, cost of $2.6 billion

中国巴基斯坦经济走廊(CPEC) 是目前国与国间最大的单边外商直接投资,其旨在协助 巴基斯坦蜕变成全球主要贸易和经济交易的中心国家。中巴经济走廊预计花费620 亿美 金,加强巴基斯坦的基础建设,并深化中国与巴基斯坦两国间的政治与经济关系。其中 许多开发计划已在兴建中。 中巴经济走廊将建造一条连接瓜达尔港至中国新疆省地区,长约2000英里的经济走 廊,包括长 2700公里由喀什地区通往瓜达尔的高速公路。用于运输货物的铁路路网架 设石油及天然气管线和铺设高速光纤。此举将为巴基斯坦带来700,000个工作机会,提 升2.5%的巴基斯坦年增率,并为这个国家的未发发展增添许多希望。

Gwadar International Airport will be able to accommodate A380s and B777s, to start in January 2019, will finish in 2019, cost of $230m

Sukkur

Solar Power Park at Bahawalpur, 900MW, started in Mar 2015, will be completed in Mar 2016. Sponsor: ZO Energey, cost of $1,33b

N6

N85

N26

Nawabshah

1,320MW coal-based project at Rahim Yar Khan, started in Mar 2015, to be completed in 2017, cost of $1,9b approx. Sponsor: Nishat Group

M8

N6

Liari

Gwadar

Hyderbad

N10

M9

Facilities of fresh water treatment To be started in Q4 2019 and completed by 2020, Cost of $130m

LNG Nawabshah-Gwadar pipeline and terminal project, started in Mar 2015. Sponsor: Interstate-Gas System Private Limited

Karachi

UEPL 100MW wind power project. Sponsor: United Energy Pakistan Limited, started in 2015, will be completed in 2016, cost of $260m

China Pak Friendship Hospital Started in 2016, to be completed in Dec 2018, cost of $100m

Infrastructure development Gwadar International Export Development Authority, started in Dec 2016, to be completed in June 2018, cost of $16m

660MW Thar power coal plant, started in Mar 2015, will be completed in 2017. SponsorL Thar Power Company, SECM, cost of $900m

2x150MW coal-fired power plant, to be started in June 2018, to be completed in Apr 2021, cost of $360m

Northern route Eastern route Western route Central route

3,8 MT coal-mining project Thar Block II, started in Mar 2015, to be completed in 2017. Sponsor: Govt of Sindh, Engro Powergen, cost of $900m

Dredging of berthing areas and channels Gwadar, started in Oct 2016, to be completed in Dec 2018, cost of $28m Acquisition of land for free zone of Gwadar Port, spread on 2,282 acres of land, cost of $65m Pak-China Technical and Vocational Institute, started in Jan 2016, to be completed in Dec 2017, cost of $10m

Infrastructure development

for export processing, started in Dec 2016, will be completed in June 2018, cost of $5m

1,320 MW Thar power Sino-Sindh resources coal plant, started in Mar 2015, to be completed in 2017. Sponsor: Sino-Sindh. Sources Limited, cost of $1,9b

Infrastructure development

for free zone, started in June 2014, to be completed in Dec 2017, cost of $12m Construction of bewakwater Gwadar Port, started in Oct 2016, to be completed by Dec 2018, cost of $122,6m Saudi Oil City Saudi Arabia To Build $10 Billion Oil Refinery In Gwadar

Dawood 50MW started in Mar 2015, to be completed in Mar 2016. Sponsor: Hydro-Dawood China, cost of $130m

50MW Sachal wind project, started in Mar 2015, to be completed in Mar 2016. Sponsor: Arif Habib Group, cost of $130m

6.5 MT/A coal-mining project, Thar block I by SSRPL, started in Mar 2015, to be completed in 2017, cost of $1,3b. Sponsor: Sino-Sindh Sourses Limited

1,320MW coal-based power project, Port Qasim. Sponsor: Pwer China, Sinohyclro, Al- Mirqab Qatar, started In March 2015, to be completed in 2017, cost of $1,8b

13 13

12