Operations training
Crane and Hoist / V2 02052025
Exercise task
What to do
Equipment for training task
Carry out 1 year inspection and maintenance on cranes
Use the manufacturer’s manual for the correct inspection and maintenance on cranes Use the manufacturer’s manual for the correct inspection and maintenance on cranes Use the manufacturer’s manual for the correct inspection and maintenance of the crane
Carry out extended inspection and maintenance on cranes, for example 5 years inspection
Shackles, torque wrench, chain hoist, load cell, slings All lifting equipment must be within certification date (correct colour code) A multi choice assignment, where some questions may have more than one possible correct answers
Carry out all the necessary load tests on cranes
The test is planned to be an individual test
Theory test on topics from the module (primarily learning objectives aiming at knowledge) that are not covered in the practical assignments in lesson 9
The participants must be informed if this is a formative or a summative test
The concepts of formative and summative evaluation and test is described in GWO Requirements for Training, Annex 4 GWO Taxonomy Framework
Note
ELEMENT 9.3 - TRAINING SCENARIO 3, INSPECTION AND MAINTENANCE ON HOISTS
The participants shall:
Perform inspection and maintenance on a hoist at hand following the maintenance procedure in the manufacturer’s manual and other relevant documents, e.g. the Inspection and Maintenance Log (see Annex 3)
Examples of exercises that must be conducted:
Task
What to do
Equipment for training task
Use the manufacturer’s manual for the correct inspection and maintenance of the hoist
Carry out 6-monthly and 1 year inspection and maintenance on hoist