SOPS

Policy & Procedure

Energy Isolation - Lock Out/Tag Out

800-12

SOP#

Effective Date

7/1/2015

Revision Date 04/12/2018

Department Asset Management Category

Safety & OSHA

Version #

Scope

To ensure all properties follow the minimum standard for energy isolation PURPOSE: The purpose of this document is to describe the procedure to be followed to ensure that all engineering departments work to the same closely controlled standards. REQUIREMENTS: Annually: Property must perform the following task(s): o Schedule, complete and document training for all associates on Lock Out/Tag Out procedures. o Ensure provided locks, locking devices, tags and lockout center for the proper isolation of hazardous energy is in order and fully stocked. o Identify all equipment, machinery, and systems that require Lock Out/Tag Out when service or maintenance is performed. o Revise all procedures on new equipment to ensure it is in Transcendent o Review the established procedure that identifies how we isolate and secure the hazardous energy sources, by type of equipment, machinery or system within the Transcendent. o Review the established log for the communication of who, what, where and when Lock Out/Tag Out is used within the Engineering department. o Ensure that outside contractors doing work on premises appropriately use and are aware of the properties’ Lock Out/Tag Out procedures. o Train all new associates at their orientation to the Engineering department on meaning and use of Lock Out/Tag Out.

1

Made with FlippingBook. PDF to flipbook with ease