Part 3 — Site Plan Review
City of Andover Unified Development Manual

Case No. SP-______-______
Applicant ______________________________________________
Included Yes No N/A
Site Plan Review Checklist — SITE PLAN REQUIRED ELEMENTS (3.4)
A. Site Planning and Building Design (3.4.2) (applies to all SPR projects) 1. Site designed for safe pedestrian movement, adequate parking, and sufficient landscaping a. Parking areas screened from view from public ways 2. Attractive transitions to adjoining properties, and interconnections with the public streetscape 3. Utility services underground 4. Miscellaneous structures and street hardware are harmonious and compatible 5. Provide for efficient maintenance a. Durable materials b. Vandal resistance c. Avoid debris traps d. Hose bibs, hydrants, or quick-couplers as needed 6. Provide for efficient drainage 7. Buildings have good scale, well-proportioned components, and are not monotonous 8. Buildings are in harmony with permanent neighboring development 9. Building materials durable, suitable, and with architectural character 10. Building colors harmonious, and compatible with surroundings B. Landscaping, Irrigation, and Maintenance (3.4.3) (applies to all SPR projects) 1. Preserve existing grades as possible; modify as necessary for drainage, screening, function, or appearance 2. Meet requirements of Vehicle Access Vision Triangle and V ision Triangle a. Shrubs within Triangles 33 inches maximum in height 3. Landscape enhances architectural features, strengthens vistas and axes, and provides shade 4. Plant palette harmonizes with architecture, has good appearance and interest in structure, texture, and color a. No artificial plant materials 5. Traffic ways and parking areas have landscaped spaces with trees a. Plants protected from injury by pedestrian or motor traffic 6. Water efficient design

Foster Design Associates LLC
Main TOC
Site Plan Review TOC
page  of  44 50
Made with FlippingBook - professional solution for displaying marketing and sales documents online