Part 2 — Unified Development Ordinance Zoning Regulations
City of Andover Unified Development Manual

F. SF-1 Zoning Lot Size Requirements. 1. Minimum zoning lot area : 20,000 square feet. 2. Minimum zoning lot width at front building setback: 100 feet. 3. Minimum zoning lot depth : 125 feet. 4. See Zoning Regulations Section 3-102D) for zoning lot depth to width ratio requirements. G. SF-1 Bulk Regulations. 1. Maximum structure height : 35 feet. 2. Yard setback requirements: a. Minimum front yard setback : 25 feet on all sides abutting a street. b. Minimum side yard setback : (1) Single-family: 10 feet.
(2) All other permitted uses: 25 feet. c. Minimum rear yard setback : 25 feet. 3. Maximum zoning lot coverage : 30%.
Main TOC
Zoning TOC

Article 5 — page  of  11 76
Foster Design Associates LLC
Zoning Districts
Made with FlippingBook - professional solution for displaying marketing and sales documents online