Representative Projects Midwest Transmission Project (MO)

Clearing of a 150 foot wide ROW along 135 miles primarily located in Missouri, installation and maintenance of SWPPP measures during clearing and transmission line construction activities, and restoration of areas disturbed during clearing and construction activities. N. Edinburg to Palmito 345 kVTransmission Line Construction (TX) Clearing and grubbing of 48 miles of transmission line ROW; reduction and disposal of cleared vegetation; installation of matting for ROW access and structure construction; installation and maintenance of erosion and sediment control measures; and installation of culverts, fencing/gates, and construction entrances for the ROW corridor. Polk to Fishhawk 230 kVTransmission Line Construction (FL) Clearing and grubbing of transmission line ROW; reduction and disposal of cleared vegetation; installation and maintenance of environmental protection measures, construction of access roads and crossings, installation of storm culvert pipes up to 60 inches in diameter, construction of pads using Geo-web with stone and earthen fill, and installation of gates and fencing. Northeast/Pocono Reliability Project (PA) Clearing of new ROW approximately 150 foot wide, grinding and disposal of vegetative debris, installation and removal of mats in wetland areas, construction of gravel access roads, removal of danger trees, and vegetation management. Susquehanna to Roseland 500 kVTransmission Line Restoration (PA) De-compaction and stabilization of 20 miles of ROW; re-vegetation of disturbed areas where necessary; restoration of approximately 90 access roads, structure pads, and wire pull sites; removal of erosion control measures, timber matting, and temporary bridges; and heavy civil services to replace soil moved during line construction activities. KansasV-Plan 345 kVTransmission Line Construction (KS) Clearing of 132 miles of 200 foot wide ROW; construction of access roads; installation of 16 foot cattle guards; installation of corrugated metal piping; installation of over 1,300 mats ranging in size from 4 feet x 16 feet to 4 feet x 30 feet; installation of silt fence, erosion control blanket, and metal fence gates; and restoration of 50 acres of ROW. Plateau Substation Site Grading (TN)

Clearing/grubbing of approximately 40 acre site and on-site excavation and embankment construction activities including 160,000 CY of mass rock blasting, import of 45,000 CY of fill, substation pad fine grading, and placement of 10,200 tons of pad erosion control stone. Southern Loop Coolidge Connector Project (VT) Clearing of 640 acres; installation and maintenance of erosion/sediment control measures; construction, repair, maintenance, and/or re-establishment of all roads within the existing ROW corridor; installation of new culverts and wood mat bridges; re-routing of stream courses as necessary; improvement and repair of existing culverts as necessary; widening of the existing ROW corridor; removal of danger trees; and trimming and/or clearing of vegetation from off-corridor access roads.

APROVEN INNOVATOR APROVENLEADER APROVENSOLUTION

pandj.com

Made with FlippingBook flipbook maker