TREX® LIGHTING–POST SLEEVE BRACKET INSTALLATION/ CONTINUED
Signature/Rod Rail/Mesh/Glass– Lower Bracket Installation
Signature/Rod Rail/Mesh/Glass– Upper Bracket Installation
15a. C enter lower bracket on post ABOVE the marked line and attach using two 2" (5.1 cm) wood screws (provided) . If using 6 x 6 post sleeve secure brackets with two 2-1/2" wood screws that are provided with the 6 x 6 post sleeve.
15b. C enter upper bracket on post ABOVE the marked line and attach using three 2" (5.1 cm) wood screws (provided). If using 6 x 6 post sleeve secure brackets with two 2-1/2" wood screws that are provided with the 6 x 6 post sleeve.
15c. U se instructions for designated railing to complete lighting installation.
16
LIGHT-OVERVIEW-1026
Made with FlippingBook Annual report maker