Installation of Brackets to Sleeves

Transcend Railing–Bracket Installation 13a. Install RSB’s UNDER marks, center on posts, and secure with two 2" wood screws (provided). Place top RSBs flat side up, bottom RSBs flat side down. If using a 6 x 6 post sleeve, secure RBS’s to post with two 2-1/2" wood screws that are provided with the 6 x 6 post sleeve.

10. If one-piece skirts were used (not shown), ensure these are in place before proceeding. Thread under-rail wiring through drilled hole on post sleeve as shown. Place post sleeve on pressure-treated post, keeping under rail light positioned so this and the wiring does not get damaged. Use shims if necessary to plum posts. If installing multiple under-rail lights install on all required sides.

11. Snap two-piece skirt on post sleeve.

Note: if there is clearance issue with hole/wiring and any skirt, trimming skirt may be required.

13b. Use instructions for designated railing to complete lighting installation.

12

Select Classic, Select T-Rail, Enhance Composite–Bracket Installation 14a. Not applicable at this stage. Refer to detailed instructions as brackets are attached to rails first and not posts.

14b. Use instructions for designated railing to complete lighting installation.

12. E nsure the opposite end of wiring is placed either through the notched blocking (if required) under the sleeve or through the drilled-out hole on the deck board. Use painters tape or equivalent and tape under-rail light to side of post sleeve.