Trex® Lighting Installation Overview

TREX® LIGHTING–POST SLEEVE/ CONTINUED

ENHANCE STEEL RAILING BRACKET AND UNDER RAIL LIGHT LOCATIONS

Bottom Bracket Location

Top Bracket Location 36"

Top Bracket Location 42"

Enhance Steel–Horizontal Fixed Bracket

3-3/8"

35-1/8"

41-1/8"

9b

Bottom of post sleeve 9a

3-1/8"

3-3/8"

See Table

9a. U sing table above, mark locations for brackets at all required locations.

9b. M easure 3-1/8" from bottom of post sleeve and drill a 1/2" hole under the location of the lower bracket being used.

Note: Do this at all locations where under-rail lighting is being installed.

9c. If installing a post sleeve that has a one-piece skirt, slide one-piece skirt over pressure-treated post.

14

LIGHT-OVERVIEW-1026