TREX® LIGHTING–POST SLEEVE/ CONTINUED
ENHANCE STEEL RAILING BRACKET AND UNDER RAIL LIGHT LOCATIONS
Bottom Bracket Location
Top Bracket Location 36"
Top Bracket Location 42"
Enhance Steel–Horizontal Fixed Bracket
3-3/8"
35-1/8"
41-1/8"
9b
Bottom of post sleeve 9a
3-1/8"
3-3/8"
See Table
9a. U sing table above, mark locations for brackets at all required locations.
9b. M easure 3-1/8" from bottom of post sleeve and drill a 1/2" hole under the location of the lower bracket being used.
Note: Do this at all locations where under-rail lighting is being installed.
9c. If installing a post sleeve that has a one-piece skirt, slide one-piece skirt over pressure-treated post.