TREX® LIGHTING–POST SLEEVE/ CONTINUED
SELECT ALUMINUM RAILING BRACKET AND UNDER RAIL LIGHT LOCATIONS
Bottom Bracket Location
Top Bracket Location 36"
Top Bracket Location 42"
Select Aluminum–Horizontal Fixed Bracket
3-9/16"
34-7/8"
40-7/8"
8b
8a
Bottom of post sleeve
3-5/16"
3-9/16"
See Table
8a. U sing table above, mark locations for brackets at all required locations.
8b. M easure 3-5/16" from bottom of post sleeve and drill a 1/2" hole under the location of the lower bracket being used.
Note: Do this at all locations where under-rail lighting is being installed.