Trex® Lighting Installation Overview

TREX® LIGHTING–POST SLEEVE/ CONTINUED

SELECT ALUMINUM RAILING BRACKET AND UNDER RAIL LIGHT LOCATIONS

Bottom Bracket Location

Top Bracket Location 36"

Top Bracket Location 42"

Select Aluminum–Horizontal Fixed Bracket

3-9/16"

34-7/8"

40-7/8"

8b

8a

Bottom of post sleeve

3-5/16"

3-9/16"

See Table

8a. U sing table above, mark locations for brackets at all required locations.

8b. M easure 3-5/16" from bottom of post sleeve and drill a 1/2" hole under the location of the lower bracket being used.

Note: Do this at all locations where under-rail lighting is being installed.

8c. If installing a post sleeve that has a one-piece skirt, slide one-piece skirt over pressure-treated post.