TREX® LIGHTING–POST SLEEVE/ CONTINUED
SELECT / ENHANCE RAILING - UNDER RAIL LIGHT LOCATION
Note: For Select Classic, Select T-Rail, and Enhance Railings, brackets are installed on rails first so bracket placement does not apply here.
6a
6b. If installing a post sleeve that has a one-piece skirt, slide one-piece skirt over pressure-treated post.
2-1/4"
6a. F or Select Classic, Select T-Rail, or Enhance Composite railing, measure 2-1/4" from bottom of post sleeve, and drill 1/2" hole. Do this at all locations where under-rail lighting is being installed.
SIGNATURE - STANDARD / ROD RAIL / MESH RAIL, GLASS RAIL HORIZONTAL RAILING BRACKET AND UNDER RAIL LIGHT LOCATIONS Bottom Bracket Location Top Bracket Location 36"
Top Bracket Location 42"
Signature/Rod Rail/Mesh/Glass*–Horizontal Fixed Bracket
1-7/8"
34-1/2"
40-1/2"
7b
7a
Bottom of post sleeve
1-5/8"
1-7/8"
See Table
7a. U sing table above, mark locations for brackets at all required locations.
7b. Measure 1-5/8" from bottom of post sleeve and drill a 1/2" hole under the location of the lower bracket being used.
Note: Do this at all locations where under-rail lighting is being installed.
7c. If installing a post sleeve that has a one-piece skirt, slide one-piece skirt over pressure-treated post.
12
LIGHT-OVERVIEW-1026
Made with FlippingBook Annual report maker