TREX® LIGHTING–ALUMINUM POST BRACKET INSTALLATION

Select Aluminum–Bracket Installation

Horizontal Railing Bracket Placement– Metal Post Select Aluminum–Horizontal Fixed Bracket

Bottom Bracket Location

Top Bracket Location 36"

Top Bracket Location 42"

3-9/16" 40-7/8" All bracket locations are measured from decking surface and are to be placed ABOVE measured/marked lines. 34-7/8"

Select Aluminum– Lower Bracket Installation

Select Aluminum– Upper Bracket Installation

9a. F or lower ABOVE bracket, center lower bracket on post above the marked line and attach using two #10 x 3/4” self-drilling screws (provided) .

9b. F or upper fixed bracket, center upper bracket on post ABOVE marked line and attach using four #10 x 3/4” self-drilling screws (provided) .