Trex® Lighting Installation Overview

TREX® LIGHTING–METAL POST BRACKET INSTALLATION

Signature Post–Bracket Installation

Horizontal Railing Bracket Placement– Metal Post Signature / Rod Rail / Mesh / Glass– Horizontal Fixed Bracket

Bottom Bracket Location

Top Bracket Location 36"

Top Bracket Location 42"

1-7/8"

34-1/2"

40-1/2"

All bracket locations are measured from decking surface and are to be placed ABOVE measured/marked lines.

Signature Post– Lower Bracket Installation

Signature Post– Upper Bracket Installation

8a. F or lower fixed bracket, center lower bracket on post ABOVE the marked line and attach using two self-tapping screws (provided) .

8b. For upper fixed bracket, center upper bracket on post ABOVE marked line and attach using three self-tapping screws (provided).

20

LIGHT-OVERVIEW-1026

Made with FlippingBook Annual report maker