Trex® Lighting Installation Overview

TREX® LIGHTING–X-SERIES LIGHTED POST CAPS INSTALLATION

4

Follow Instructions below for Signature X-Series Post

Signature X-Series Anchor Post

PREPARING X-SERIES ANCHOR POSTS FOR LIGHTED POST CAPS

1. E nsure proper blocking has been installed as per requirements set forth in the X-Series Post instructions.

2

4. U sing post as template, place post in desired location, and mark location of mounting bolts and wiring hole.

5

No cable installation at this location

5. S et post aside and drill through decking and blocking using same 9/16” long drill bit.

6

2. R emove one channel cover from side of post, ensuring this location is not the same as where cable railing is being installed. See example.

3

3. L ocate and drill 9/16" hole through the bottom of baseplate.

6. P lace wire in the channel of the post and thread through pre-drilled hole in baseplate, decking and blocking.

24

LIGHT-OVERVIEW-1026

Made with FlippingBook Annual report maker