TREX® LIGHTING–X-SERIES LIGHTED POST CAPS INSTALLATION
4
Follow Instructions below for Signature X-Series Post
Signature X-Series Anchor Post
PREPARING X-SERIES ANCHOR POSTS FOR LIGHTED POST CAPS
1. E nsure proper blocking has been installed as per requirements set forth in the X-Series Post instructions.
2
4. U sing post as template, place post in desired location, and mark location of mounting bolts and wiring hole.
5
No cable installation at this location
5. S et post aside and drill through decking and blocking using same 9/16” long drill bit.
6
2. R emove one channel cover from side of post, ensuring this location is not the same as where cable railing is being installed. See example.
3
3. L ocate and drill 9/16" hole through the bottom of baseplate.
6. P lace wire in the channel of the post and thread through pre-drilled hole in baseplate, decking and blocking.
24
LIGHT-OVERVIEW-1026
Made with FlippingBook Annual report maker