Carillon_2011_05_11

Ontario Energy Board

Commission de l’énergie de l’Ontario

EB-2010-0090

HydroHawkesburyInc. TARIFFOFRATESANDCHARGES EffecƟveand ImplementaƟonDateMay1,2011

Thisschedulesupersedesandreplacesallpreviously approvedschedulesofRates,ChargesandLossFactors Rates were set using incenƟve regulaƟon guidelines, a formula that provides a standard adjustment to rates to account for inflaƟon and to encourage producƟvity improvements. The new rates take effect May 1, 2011. Ontario Energy Board (OEB) released Regulated Price Plan (RPP) electricity commodity prices that take effect May 1, 2011. The esƟmated Ɵered bill impact, including the change in the seasonal threshold, is an increase of about 6.1% on the total bill, or $6.12 per month, for residenƟal consumers who use 800 kWh of electricity a month. The change in seasonal threshold accounts for approximately $2 of that esƟmated bill impact.

Written Hearing The Board intends to proceed with this matter by way of a written hearing unless a party satisfies the Board that there is a good reason for not holding a written hearing. If you object to the Board holding a written hearing in this matter, you must provide written reasons why an oral hearing is necessary. Any submissions objecting to a written hearing must be received by the Board and copied to the applicant no later than May 27, 2011. How to Participate You may participate in this proceeding in one of two ways: 1. Become an Intervenor Intervenors participate actively in the proceeding (i.e., submit written questions, evidence, and arguments, and cross-examine witnesses at an oral hearing). A request for intervenor status must be made by letter of intervention and be received by the Board no later than 7 days after the Notice of Application has been published. A letter of intervention must include: (a) a description of how you are, or may be, affected by the outcome of this proceeding; and (b) if you represent a group, a description of the group and its membership. The Board may order costs in relation to the Group 1 Account issue. You must indicate in your letter of intervention whether you expect to seek costs from the applicant and the grounds for your eligibility for costs. You must provide a copy of your letter of intervention to Hydro Hawkesbury. Everythingan intervenorfileswith theBoard, including the intervenor’snameandcontact information, will be placed on the public record, which means that all filings will be available for viewing at the Board’s offices and will be placed on the Board’s website. If you already have a user ID, please submit your intervention request through the Board’s web portal at www.errr.ontarioenergyboard. Additionally, two paper copies must be submitted to the address set out below. If you do not have a user ID, visit the Board’s website under e-Filing Services and complete a user ID/password request form. For instructions on how to submit documents and naming conventions please refer to the RESS Document Guidelines found at www.ontarioenergyboard.ca/OEB/Industry, e-Filing Services. The Board also accepts interventions by e-mail, at the address below, and again, two additional paper copies are required. Those who do not have internet access are required to submit their intervention request on a CD in PDF format, along with two paper copies. Evidence Hydro Hawkesbury shall file with the Board and all other parties no later than 14 days after the Notice of Application has been published, the following additional evidecnce (the “Additional Evidence”): • A revised Deferral and Variance Account Workform which accurately reflects the Group 1 account balances as at December 31, 2009. • A summary of the changes made from the original filing and an explanation for the revised balances. • Any other information that it feels is relevant to the errors in the balances presented by Hydro Hawkesbury for Account 1588 – RSVA – Power (excluding the global adjustment sub-account) and 1. Board-approved intervenors or Board staff wishing information and material from Hydro Hawkesbury that is in addition to the evidence filed with the Board on November 12, 2010 (the “Original Evidence”) and the Additional Evidence and that is relevant to the issues for this hearing as enumerated above, shall request it by written interrogatories filed with the Board and delivered to Hydro Hawkesbury no later than 14 days after Hydro Hawkesbury’s Additional Evidence has been filed with the Board. 2-Hydro Hawkesbury shall file with the Board complete responses to the interrogatories and deliver them to all intervenors no later than 21 days after the Hydro Hawkesbury’s Additional Evidence has been filed with the Board. 3-Written submissions by an intervenor or Board staff must be filed with the Board, and copied to all other parties no later than 28 days after Hydro Hawkesbury’s Additional Evidence has been filed with the Board. 4-If Hydro Hawkesbury wishes to respond to the submissions, its written response must be filed with the Board and delivered to all other parties no later than 35 days after Hydro Hawkesbury’s Additional Evidence has been filed with the Board. 2. Send a Letter with your Comments to the Board If you wish to comment on the proceeding without becoming an intervenor, you may submit a letter of comment to the Board Secretary. All letters of comment sent to the Board will be placed on the public record, which means that the letters will be available for viewing at the Board’s offices and will be placed on the Board’s website. Before placing the letter of comment on the public record, the Board will remove any personal (i.e., not business) contact information from the letter of comment (i.e., the address, fax number, phone number, and e-mail address of the individual). However, the name of the individual and the content of the letter of comment will become part of the public record. A complete copy of your letter of comment, including your name, contact information, and the content of the letter, will be provided to the applicant and the Hearing Panel.Your letter of comment must be received by the Board no later than 14 days after the Hydro Hawkesbury’s Additional Evidence has been filed with the Board. The Board accepts letters of comment by either post or e-mail at the addresses below. How to Contact Us In responding to this notice, please reference Board file number EB-2010-0090 in the subject line of your e-mail or at the top of your letter. It is also important that you provide your name, postal address and telephone number and, if available, an e-mail address and fax number. All communications should be directed to the attention of the Board Secretary at the address below, and be received no later than 4:45 p.m. on the required date. Need More Information? Further information on how to participate may be obtained by visiting the Board’s website at www.ontarioenergyboard.ca/OEB/Industry or by calling our Consumer Relations Centre at 1-877-632-2727. IMPORTANT IF YOU DO NOT FILE AN OBJECTION TO A WRITTEN HEARING OR DO NOT PARTICIPATE IN THE HEARING BY FILING A LETTER IN ACCORDANCE WITH THIS NOTICE, THE BOARD MAY PROCEED WITHOUT YOUR PARTICIPATION AND YOU WILL NOT BE ENTITLED TO FURTHER NOTICE IN THIS PROCEEDING. the global adjustment sub-account. Interrogatories and Submissions

Tiered prices are changing as follows:

Price for consumption up to 600 kWh/month = 6.8 cents/kWh Price for consumption above 600 kWh/month = 7.9 cents/kWh

RESIDENTIALSERVICECLASSIFICATION MONTHLYRATESANDCHARGES–DeliveryComponent ServiceCharge $ 6.04 Smart Meter Funding Adder – effective until April 30, 2012 $ 1.45

Distribution Volumetric Rate $/kWh 0.0079 Low Voltage Service Rate $/kWh 0.0004 Rate Rider for Deferral/Variance Account Disposition (2010) – effective until April 30, 2012 $/kWh (0.0034) Retail Transmission Rate – Network Service Rate $/kWh 0.0063 Retail Transmission Rate – Line and Transformation Connection Service Rate $/kWh 0.0033 GENERALSERVICELESSTHAN50kWSERVICECLASSIFICATION MONTHLYRATESANDCHARGES–DeliveryComponent Service Charge $ 14.08 Smart Meter Funding Adder – effective until April 30, 2012 $ 1.45 Distribution Volumetric Rate $/kWh 0.0054 Low Voltage Service Rate $/kWh 0.0004 Rate Rider for Deferral/Variance Account Disposition (2010) – effective until April 30, 2012 $/kWh(0.0049) Retail Transmission Rate – Network Service Rate $/kWh 0.0057 Retail Transmission Rate – Line and Transformation Connection Service Rate $/kWh 0.0029 GENERALSERVICE50 to4,999kWSERVICECLASSIFICATION MONTHLYRATESANDCHARGES–DeliveryComponent Service Charge $ 109.96 Smart Meter Funding Adder – effective until April 30, 2012 $ 1.45 Distribution Volumetric Rate $/kW 1.5288 Low Voltage Service Rate $/kW 0.1369 Rate Rider for Deferral/Variance Account Disposition (2010) – effective until April 30, 2012 $/kW (2.2347) Retail Transmission Rate – Network Service Rate $/kW 2.3155 Retail Transmission Rate – Line and Transformation Connection Service Rate $/kW 1.1752 Distribution Volumetric Rate $/kWh 0.0021 Low Voltage Service Rate $/kWh 0.0004 Rate Rider for Deferral/Variance Account Disposition (2010) – effective until April 30, 2012 $/kWh (0.0052) Retail Transmission Rate – Network Service Rate $/kWh 0.0057 Retail Transmission Rate – Line and Transformation Connection Service Rate $/kWh 0.0029 SENTINELLIGHTINGSERVICECLASSIFICATION MONTHLYRATESANDCHARGES–DeliveryComponent Service Charge (per connection) $ 1.62 Distribution Volumetric Rate $/kW 3.1724 Low Voltage Service Rate $/kW 0.2162 Rate Rider for Deferral/Variance Account Disposition (2010) – effective until April 30, 2012 $/kW (0.6044) Retail Transmission Rate – Network Service Rate $/kW 1.7470 Retail Transmission Rate – Line and Transformation Connection Service Rate $/kW 1.8550 STREETLIGHTINGSERVICECLASSIFICATION MONTHLYRATESANDCHARGES–DeliveryComponent Service Charge (per connection) $ 0.62 Distribution Volumetric Rate $/kW 6.6567 Low Voltage Service Rate $/kW 0.1059 Rate Rider for Deferral/Variance Account Disposition (2010) – effective until April 30, 2012 $/kW (1.7655) Retail Transmission Rate – Network Service Rate $/kW 1.7464 Retail Transmission Rate – Line and Transformation Connection Service Rate $/kW 0.9085 APPLIESTOALLRATECLASSIFICATION Hydro Hawkesbury Inc. (“Hydro Hawkesbury”) filed an application with the Ontario Energy Board (the “Board”) on November 12, 2010 under section 78 of the Ontario Energy Board Act, 1998, S.O. 1998, c.15 (Schedule B), seeking approval for changes to the rates that Hydro Hawkesbury charges for electricity distribution, to be effective May 1, 2011. The application was filed under the Board’s guidelines for 3 rd Generation Incentive Regulation, which provides for a mechanistic and formulaic adjustment to distribution rates between cost of service applications. The Board has assigned the application File No. EB-2010-0090. The Board issued a Partial Decision and Order on April 29, 2011 which dealt with all aspects of the Application with the exception of Disposition of Group 1 Account balances. The Board noted that there are errors in the balances presented by Hydro Hawkesbury for Account 1588 – RSVA – Power (excluding the global adjustment sub-account) and the global adjustment sub-account. Since these account balances are disposed of to different groups of customers (i.e. all customers versus non-RPP customers), the Board is concerned about the allocation of balances amongst these customer groups in the context of the proceeding presently before the Board. As a result, in order to ensure that the potential disposition of these accounts in this proceeding is appropriate and does not perpetuate the error and create allocation issues between customer groups arising from this application, the Board intends to correct the error. The Board has determined that in order to ensure that ratepayers that may be potentially impacted by the correction are aware of, and can speak to the correction of the error; a supplementary proceeding is required on this issue. How to see Hydro Hawkesbury’s Application Copies of the application are available for inspection at the Board’s office in Toronto and on its website, www.ontarioenergyboard.ca/OEB/Industry, and at Hydro Hawkesbury’s office and may be on its website. UNMETEREDSCATTEREDLOADSERVICECLASSIFICATION MONTHLYRATESANDCHARGES–DeliveryComponent Service Charge (per customer) $ 7.03 Wholesale market Service rate $kWh 0.0052 Rural rate Protection Charge $/kWh 0.0013 Standard Supply Service- Administrative Charge (If applicable)$ 0.25 NOTICEOFAPPLICATIONANDHEARING HYDROHAWKESBURY INC.

OPÉRATEUR DE CONCASSEUR

• Doit avoir une connaissance dans le domaine du concassage • Être prêt à se déplacer à l’extérieur • Doit posséder une base en maintenance mécanique • Avoir un esprit d’équipe • Être capable de prendre des décisions et de donner des directives • Maximiser le rendement des équipements tout en respectant la loi sur la santé et sécurité • Effectuer les rapports exigés par la direction. Faire parvenir votre curriculum vitae à l’attention de M. Michel Landriault par courriel à m.landriault@financo.it ou par courrier à : Colacem Canada Inc. Division Bertrand Construction A/S Michel Landriault CP 301, 56 rue Longueuil L’Orignal ON K0B 1K0

OPPORTUNITÉS EXCEPTIONNELLES! CONSEILLERÈRE EN HABITATION ET DIRECTEURTRICE DES VENTES Rockland • Wendover • Aylmer

Nous recherchons 2 spécialistes de la vente bilingues, dynamiques et fiables. Salaire de base plus commission. Revenu annuel 100 000 $ + SURINTENDANTS DE CHANTIER Nous recherchons 3 surintendants de chantier expérimentés pour nos nouveaux projets domiciliaires de Rockland, Wendover et Gatineau (secteur Aylmer).

ADDRESSES

THE APPLICANT : Hydro Hawkesbury Inc. 850 Tupper Street Hawkesbury ON K6A 3S7 Attention: Ms. Linda Parisien E-mail: lindaparisien@hydrohawkesbury.ca

THE BOARD: Ontario Energy Board P.O. Box 2319 27 th Floor 2300 Yonge Street Toronto ON M4P 1E4 Attention: Board Secretary Filings: https://www.errr.ontarioenergyboard.ca E-mail: boardsec@ontarioenergyboard.ca Tel: 1-888-632-6273 (Toll free) Fax: 416-440-7656 DATED at Toronto, April 29, 2011 ONTARIO ENERGY BOARD Original signed by Kirsten Walli Board Secretary

Tel: (613) 632-6689 Fax: (613) 632-8603

Transmettre votre demande d’emploi à : Ginette Cousineau

Par courriel : gcousineau@alja.ca Par télécopieur : 819 663-7444

Made with FlippingBook - Online Brochure Maker