2024-06-24_BTT_V9

Technical training

Basic Technical Training Standard / V9 2024-06-24

ELEMENT 2.1 - INSTALLATION OVERVIEW

Learning objective:

13) The participants can describe the main installation activities (Knowledge, basic level)

The instructor shall:

Present the main activities required for the installation of turbines. This will include:

a.

Incoming inspection of components

b.

Unloading

c.

Storage and preservation

d.

Repair

e.

Preparation

f.

Pre-assembly

g.

Lifting / assembly

h.

Tightening

i.

Cable work

j.

Finishing (Mechanical, Hydraulic and Electrical)

Ask the participants relevant questions about the main activities required for the installation of turbines

The participants shall:

Describe in their own words and share understandings about the main activities required for the installation of turbines

ELEMENT 2.2 - WHY INSTALLATION SAFETY

Learning objectives:

Global Wind Organisation / www.globalwindsafety.org

186 / 269

Made with FlippingBook Digital Proposal Creator