FW_MTP_Appendices 20260519

Master Transportation Plan Task 4: Gap Analysis and Needs Network

3.2.4 Spatial Gaps Results The spatial gaps shared below encompass the results of both the script-generated and manually generated links elevated from previous iterations of Master Thoroughfare planning activity. The geospatial outputs from the physical roadway gap analysis steps can be found in Appendix 3 . 3.2.4.1 Priority Gaps The priority gaps shared are recommended for future inclusion in the Master Thoroughfare Plan Update. The priority gaps are shown at the functional classification of arterials and collectors. Figure 5 shares both the priority gaps and project links identified as “roadway gaps” in the City of the Fort Worth Connecting the Core project. Each project’s identified gaps are displayed with its corresponding project ID number and are corresponding to the following tables. Priority gaps are listed in

Table 1 and Connecting the Core projects are shown in Table 2 .

www.MovingaMillion.org | transportation@fortworthtexas.gov page 13

Made with FlippingBook - professional solution for displaying marketing and sales documents online