Master Transportation Plan Task 4: Gap Analysis and Needs Network
Project ID
Street From
Street To
Functional Class Collector
Connection Length (Miles) Residential 0.84
84
Whisper Willows Drive
Letara Ranch Road
98
I-20
I-820
Arterial
Regional
9.03
103
John Day Road (MTP)
Avondale Haslet Road
Collector
Residential 0.82
104
Rancho Canyon Way
Highway 114
Arterial
Residential 2.62
Table 2. Connecting the Core Projects
Project ID
Facility Name
On or Off System
Project Type
Length (Miles)
3a
Northside Drive, between Main Street & Henderson
Mix
Reconfiguration
1.48
1b
Brennan & East Exchange Avenue
Off System
Mix
0.38
1a
23rd Street
Off System
Mix
1.27
2e
Main Street Bridge (new channel area)
Off System
New Facility
0.25
13a
Belknap
On System
Reconfiguration
0.89
13b
4th Street
Off System
New Facility
0.21
13c
Sylvania Avenue
Mix
Reconfiguration
1.30
13d
Riverside Drive Bridge
Off System
Reconfiguration
0.20
12h
Pine Street Bridge & Stitch
Mix
Reconfiguration
0.20
9a
West Freeway @ South University Drive
Mix
New Facility
0.34
12d
19th Street
Mix
New Facility
0.31
12f
IM Terrell to Riverside
Mix
New Facility
0.44
1c.1
Samuel Drive
Off System
Supportive Project
0.65
5a
Belknap & Weatherford, between Henderson Street and east of Pecan Street Belknap & Weatherford, between Henderson Street and east of Pecan Street
Mix
Reconfiguration
0.79
5a
Mix
Reconfiguration
0.78
10b
Kansas Street grade separation
Mix
New Facility
0.50
4a
Forest Park Boulevard to Henderson
Mix
New Facility
0.27
4a.2
West 7th / Henderson / Summit Street circulation
Mix
Supportive Project
0.37
4a.1
North Henderson Street
On System
Supportive
0.13
www.MovingaMillion.org | transportation@fortworthtexas.gov page 16
Made with FlippingBook - professional solution for displaying marketing and sales documents online