Master Transportation Plan Task 4: Gap Analysis and Needs Network

Project ID

Facility Name

On or Off System

Project Type

Length (Miles)

& Lancaster)

Project

16i

Modified IH 35W Freeway Access (US 287, IH 30 East, & Lancaster) Modified IH 35W Freeway Access (US 287, IH 30 East, & Lancaster)

Mix

Supportive Project Supportive Project

1.33

16f

Mix

0.29

12l

280 / I35 NB ramp

Mix

Reconfiguration

0.87

12b

9th Street

Mix

New Facility

0.41

1d

(New) Panther East Bridge Alt. 2

Off System

New Facility

0.57

1c

(New) Panther East Bridge Alt. 1

Off System

New Facility

0.32

2d

UPR ROW high-capacity corridor

Mix

New Facility

2.60

1e

Samuel Drive to I-35

Mix

New Facility

0.71

5b

Belknap / Weatherford & US 121 interchange with I-35

On System

Supportive Project Supportive Project

0.39

5b

Belknap / Weatherford & US 121 interchange with I-35

On System

0.44

12j

US 287 frontage @ Beach Street & IM Terrell Way

Mix

Reconfiguration

1.38

17m

New Trinity River bridge

Off System

New Facility

0.07

1c.2

Samuel Drive & Belknap / Weatherford

Mix

Supportive Project

0.12

3.2.4.2 Secondary Gaps The following section shares the results of both the script-generated and manually generated links elevated from previous iterations of Master Thoroughfare planning activity. The Secondary Gaps are shown at the functional classification, including arterials, collectors, backage, and local roads, and are shared for analysis purposes. Figure 6 shares the Secondary Gaps where arterials, collectors, and backage roads are identified with their corresponding project ID number. Secondary gaps are listed in