Master Transportation Plan Task 4: Gap Analysis and Needs Network
Project ID
Facility Name
On or Off System
Project Type
Length (Miles)
& Lancaster)
Project
16i
Modified IH 35W Freeway Access (US 287, IH 30 East, & Lancaster) Modified IH 35W Freeway Access (US 287, IH 30 East, & Lancaster)
Mix
Supportive Project Supportive Project
1.33
16f
Mix
0.29
12l
280 / I35 NB ramp
Mix
Reconfiguration
0.87
12b
9th Street
Mix
New Facility
0.41
1d
(New) Panther East Bridge Alt. 2
Off System
New Facility
0.57
1c
(New) Panther East Bridge Alt. 1
Off System
New Facility
0.32
2d
UPR ROW high-capacity corridor
Mix
New Facility
2.60
1e
Samuel Drive to I-35
Mix
New Facility
0.71
5b
Belknap / Weatherford & US 121 interchange with I-35
On System
Supportive Project Supportive Project
0.39
5b
Belknap / Weatherford & US 121 interchange with I-35
On System
0.44
12j
US 287 frontage @ Beach Street & IM Terrell Way
Mix
Reconfiguration
1.38
17m
New Trinity River bridge
Off System
New Facility
0.07
1c.2
Samuel Drive & Belknap / Weatherford
Mix
Supportive Project
0.12
3.2.4.2 Secondary Gaps The following section shares the results of both the script-generated and manually generated links elevated from previous iterations of Master Thoroughfare planning activity. The Secondary Gaps are shown at the functional classification, including arterials, collectors, backage, and local roads, and are shared for analysis purposes. Figure 6 shares the Secondary Gaps where arterials, collectors, and backage roads are identified with their corresponding project ID number. Secondary gaps are listed in