FW_MTP_Appendices 20260519

Type of Projects

No.

Facility / Project Name

From

Description

Coded (Y/N)

To

Old Decatur Rd

Design and reconfigure 6.92-miles of existing roadway to accommodate a six (6)-lane divided principal arterial roadway with grade separation above the US-287 corridor. Design and reconfigure 2.54-miles of existing roadway to accommodate a six (6)-lane divided principal arterial roadway. Design and reconfigure 4.72-miles of existing roadway to accommodate a six (6)-lane divided principal arterial roadway. Design and reconfigure 2.38-miles of existing roadway to accommodate a six (6)-lane divided principal arterial roadway. Design and reconfigure 1.9-miles of existing roadway to accommodate a four (4)-lane divided arterial roadway. Design and reconfigure 3.93-miles of existing roadway to accommodate a six (6)-lane divided principal arterial roadway. Design and reconfigure 3.96-miles of existing roadway to accommodate a six

Bailey Boswell Road - Basswood Boulevard

Basswood Blvd

6

Y

Lancaster Ave

Van Ciburn Way

Camp Bowie Boulevard

7

Y

Verna Trail

8

Walsh ranch Pkwy

Y

Clifford Street - White Settlement Road

9

Chapel Creek Blvd

Chapel Creek Blvd

Y

Westpoint Boulevard

Chapel Creek Blvd

Chapin Rd

10

Y

Chapel Creek Boulevard

IH20 FRTG WB

Granbury Rd

Y

11

Granbury Road - Summer Creek Drive

Norwood Dr

Commercial LP

Y

12

Trinity Boulevard

www.MovingaMillion.org | transportation@fortworthtexas.gov page 78

Made with FlippingBook - professional solution for displaying marketing and sales documents online