Type of Projects
No.
Facility / Project Name
From
Description
Coded (Y/N)
To
Old Decatur Rd
Design and reconfigure 6.92-miles of existing roadway to accommodate a six (6)-lane divided principal arterial roadway with grade separation above the US-287 corridor. Design and reconfigure 2.54-miles of existing roadway to accommodate a six (6)-lane divided principal arterial roadway. Design and reconfigure 4.72-miles of existing roadway to accommodate a six (6)-lane divided principal arterial roadway. Design and reconfigure 2.38-miles of existing roadway to accommodate a six (6)-lane divided principal arterial roadway. Design and reconfigure 1.9-miles of existing roadway to accommodate a four (4)-lane divided arterial roadway. Design and reconfigure 3.93-miles of existing roadway to accommodate a six (6)-lane divided principal arterial roadway. Design and reconfigure 3.96-miles of existing roadway to accommodate a six
Bailey Boswell Road - Basswood Boulevard
Basswood Blvd
6
Y
Lancaster Ave
Van Ciburn Way
Camp Bowie Boulevard
7
Y
Verna Trail
8
Walsh ranch Pkwy
Y
Clifford Street - White Settlement Road
9
Chapel Creek Blvd
Chapel Creek Blvd
Y
Westpoint Boulevard
Chapel Creek Blvd
Chapin Rd
10
Y
Chapel Creek Boulevard
IH20 FRTG WB
Granbury Rd
Y
11
Granbury Road - Summer Creek Drive
Norwood Dr
Commercial LP
Y
12
Trinity Boulevard
www.MovingaMillion.org | transportation@fortworthtexas.gov page 78
Made with FlippingBook - professional solution for displaying marketing and sales documents online