Type of Projects
No.
Facility / Project Name
From
Description
Coded (Y/N)
To
Design, acquire ROW, and construct a new 3.04-mile six (6)-lane divided arterial roadway. Design, acquire ROW, and construct a new 0.08-mile two (2)-lane undivided local roadway. Design, acquire ROW, and construct a new 0.54-mile two (2)-lane undivided local roadway. Design, acquire ROW, and construct a new 0.53-mile two (2)-lane undivided local roadway. Design, acquire ROW, and construct a new 0.28-mile two (2)-lane undivided localroadway. Design, acquire ROW, and construct a new 0.29-mile two (2)-lane undivided local roadway. Design, acquire ROW, and construct a new 0.50-mile two (2)-lane undivided major collector roadway. Design, acquire ROW, and construct a new 1.28-mile two (2)-lane undivided arterial roadway. Design, acquire ROW, and construct a new 0.04-mile two (2)-lane undivided local roadway. Design, acquire ROW, and construct a new 0.04-mile two (2)-lane undivided local roadway.
N
Harmonson Rd
FM 156 S
I-35
97
N
Eastview St
Eastview St
MTP
98
N
Eastview St
Cunningham St (PG)
Risinger Rd
99
N
Southworth Dr
Ronald Dr
Hemphill (MTP)
100
N
Wolf Mountain Ln
Flagstaff Run
Oak Grove Rd
101
N
Silver Lake Trl
102
Tammaron Trl
Oak Grove Rd
N
Berry Rd
Priority Gap #78
103
Berry Rd
N
Sam Reynolds Rd
104
Ben Bert Rd
Highway 114
N
105
Jamesway Rd
Over Lake Dr
Basswood Dr
N
106
Shaddydell Dr
Over Lake Dr
Basswood Dr
www.MovingaMillion.org | transportation@fortworthtexas.gov page 88
Made with FlippingBook - professional solution for displaying marketing and sales documents online