Altamesa Boulevard Lana Circle to Forest Hill Drive

PROJECT PURPOSE The project will enhance connectivity and mobility by constructing a four-lane divided roadway on Altamesa Boulevard approximately 0.6 miles from its current terminus at Lana Circle to meet Forest Hill Drive at Lon Stephenson Road.

PROJECT OVERVIEW Limits : Lana Cir to Forest Hill Dr Length : ~0.6 mile Proposed Cross Section: » Two 11’ travel lanes in each direction » 28’ Median » 10’ shared-use path on both sides » 117’ right-of-way

10’ SUP

4’

11’ Lane

11’ Lane

28’ Median

11’ Lane

11’ Lane

4’

10’ SUP

ALTAMESA BLVD - TYPICAL SECTION

PROJECT BENEFITS

PROJECT COSTS $31.7 million (FY 2030 $) JURISDICTION Council District 8

Provides a key linkage to an area planned for residential and neighborhood commercial uses, and enhancing regional access across southern Fort Worth. Reduces through traffic on residential streets and increases safety through a divided roadway design. Supports economic growth by improving access for local businesses and freight movement.