Altamesa Boulevard Lana Circle to Forest Hill Drive
PROJECT PURPOSE The project will enhance connectivity and mobility by constructing a four-lane divided roadway on Altamesa Boulevard approximately 0.6 miles from its current terminus at Lana Circle to meet Forest Hill Drive at Lon Stephenson Road.
PROJECT OVERVIEW Limits : Lana Cir to Forest Hill Dr Length : ~0.6 mile Proposed Cross Section: » Two 11’ travel lanes in each direction » 28’ Median » 10’ shared-use path on both sides » 117’ right-of-way
10’ SUP
4’
11’ Lane
11’ Lane
28’ Median
11’ Lane
11’ Lane
4’
10’ SUP
ALTAMESA BLVD - TYPICAL SECTION
PROJECT BENEFITS
PROJECT COSTS $31.7 million (FY 2030 $) JURISDICTION Council District 8
Provides a key linkage to an area planned for residential and neighborhood commercial uses, and enhancing regional access across southern Fort Worth. Reduces through traffic on residential streets and increases safety through a divided roadway design. Supports economic growth by improving access for local businesses and freight movement.
Precinct 1
PROJECT CONTACT transportation@fortworthtexas.gov
www.movingamillion.org
Made with FlippingBook - professional solution for displaying marketing and sales documents online