Altamesa Boulevard Wichita Street to Lana Circle

PROJECT PURPOSE The project will close a key gap in Fort Worth’s roadway network by restriping the existing pavement to create a four-lane divided arterial roadway to improve mobility, safety, and pedestrian access. PROJECT OVERVIEW Limits : Wichita St to Lana Cir Length : ~0.3 mile Proposed Cross Section: » Two 11’ travel lanes in each direction » 28’ Median » 8’ buffered bike lane on both sides » 6’ sidewalk on both sides » 120’ right-of-way

6’ Sidewalk

8’ Bike Lane

6’

11’ Lane

11’ Lane

28’ Median

11’ Lane 11’ Lane

6’

8’ Bike Lane

6’ Sidewalk

ALTAMESA BLVD - TYPICAL SECTION

PROJECT BENEFITS

PROJECT COSTS $3.3 million (FY 2030 $) JURISDICTION Council District 8

Provides a direct east-west connection, reducing travel delays and enhancing regional access across southern Fort Worth. Reduces congestion, improves travel times, and accommodates increased passenger demand. Incorporates dedicated sidewalks and bike lanes on both sides of the roadway, promoting walkability and cycling accessibility.

Precinct 1

PROJECT CONTACT transportation@fortworthtexas.gov

www.movingamillion.org

Made with FlippingBook - professional solution for displaying marketing and sales documents online