South County Integrated Mobility Study

Figure 43. Pedestrian priority corridors Source: Hillsborough County MPO - 2025 Comprehensive Pedestrian Plan, 2004

Roadway segments in the study area with no sidewalks are shown in Table 7. Unfunded priority corridors in the study area include: Riverview Drive and Symmes Road from US 41 to US 301 and SR 674 from Interstate 75 to Westlake Drive; US 41 from 19 th Avenue NE and SR 674; US 41 from Elsberry Road to Leisey Road

Table 7. Roadway Segments in South County with No Sidewalks

Street

From

To

19 th Ave NE

US Highway 301 Columbus Drive US Highway 301

US Hwy 41

19 th Ave

40th St

Big Bend Rd

I-75

Source: 2025 Comprehensive Pedestrian Plan, 2004

6.2 Planned Improvements

Greenways and Trails Plan Update

In 1995, the Hillsborough County Board of County Commissioners (BOCC) approved the Hillsborough County Greenways Master Plan (found in the Recreation and Open Space Element of the Comprehensive Plan). The Hillsborough Greenways Conceptual Plan, seen in Appendix H,

62

Made with FlippingBook Learn more on our blog