South County Integrated Mobility Study

Figure 49. FDOT District 7 SIS atlas Source: FDOT - SIS Atlas, 2017

Table 8. SIS Unfunded Projects in the South County Study Area

Facility

Description

Horizon

Improvement Type

Highway

Big Bend Road

from US 41 to Covington Garden Drive

Short-term

Add 2 lanes to build 6 lanes

I-75 I-75 I-75 I-75

at Gibsonton Drive at Big Bend Road

Long-term Long-term Long-term Long-term

Modify Interchange Modify Interchange Modify Interchange New Interchange

at SR 674

at South County Interchange

Rail

CSX Transportation

Short-term Mid-term Mid-term

Grade Separation Capacity Upgrade New Freight Rail Line

Tampa Port Authority at Port Redwing

New SW Rail Line

from AZA line to Welcome Junction

Seaports

Port of Tampa Port

Redwing Access Road

Short-term

Internal Roadway

Source: FDOT - Florida’s SIS Multi -Modal Unfunded Needs Plan, 2011

69

Made with FlippingBook Learn more on our blog