Welcome to Centrifugal Associates Group, LLC, your complete Mechanical, Electrical, Plumbing and Sprinkler ("MEPS") trade services contractor.
UPDATED 03/17/2022
Welcome to Centrifugal Associates Group, LLC. Your complete Mechanical, Electrical, Plumbing, and Sprinkler (”MEPS”) trade services contractor. We started in the industry as a service and maintenance organization servicing large centrifugal refrigeration, steam-driven chillers, and absorption machines. Our success in the industry created the opportunity to grow our company into one of the largest full-service mechanical contractors in New York City. From this solid foundation, we have expanded to oer a complete, fully bondable MEPS services package for your project in the New York Market place.
OUR COMMITMENT We are committed to being the highest quality full-service MEP contractor in NYC. We provide these services with professionalism, integrity, dedication, and expertise, ensuring our customer's complete satisfaction. We intend to be fair and ethical in treating our customers, employees, and vendors. We strive to create a positive, stimulating, secure work environment emphasizing personal growth and opportunity through the utilization of the diversied talents of our employees. We intend to make a fair prot by providing MEP contracting services to our customers, honestly sharing their concerns for quality, dependability, and value. OUR CREED We believe that, above all, people count. We strive to create an environment that stresses respect for the individual and pro- motes trust, honesty, and genuine caring for one another, our customers, and our vendors. We believe that our success depends on doing business fairly, honestly, and ethically. We always strive to be professional, reliable, and responsible. We believe preserving the innovation and entrepreneurial spirit upon which our company was created will best ensure our success. We strive to have a winning attitude, which is positive, goal, result, and team-oriented. We believe that in order for our company to continue and ourish, we must operate protably. Our nancial stability demands that we maintain high levels of productivity and eciency.
MECHANICAL - ELECTRICAL - PLUMBING - FIRE PROTECTION
Full service installations for new and existing buildings. Residential, Commercial, Industrial, Institutional. We can service every conceivable type of structure throughout New York City, from initial planning to completion.
55 WILLOUGHBY STREET, BROOKLYN HVAC
$9.8 MILLION JOB COMPLETE INSTALLATION OF HVAC SYSTEM FOR 70 STORY LUXURY BUILDING APARTMENT IN MIDTOWN MANHATTAN. SYSTEMS INCLUDE LG VRF AND EPOCHA ERVs.
$6.5 MILLION HVAC JOB COMPLETE INSTALLATION OF A MITSUBISHI VRF SYSTEM FOR A 42 STORY BUILDING IN THE HEART OF DOWNTOWN BROOKLYN.
$20 MILLION JOB COMPLETE INSTALLATION OF VERTICAL STACK HEAT PUMPS SYSTEM FOR A STATE OF THE ART 50 STORY CONDOMINIUM.
$10.45 MILLION JOB INSTALLATION OF GEOTHERMAL HEAT PUMP SYSTEM FOR TWIN 27 STORY TOWERS IN CONEY ISLAND.
$49 MILLION JOB ($25 MILLION HVAC - $24 MILLION PLUMBING) TWIN 45 STORY TOWERS LOCATED IN LIC, QUEENS. COMPLETE HVAC INSTAL- LATION INCLUDING HEAT PUMPS, PTAC’S AND DAIKIN VRF PLUS COMPLETE PLUMBING INSTALLATION.
$11.5 MILLION JOB ($5.6 HVAC - $5.9 M PLUMBING) COMPLETE HVAC AND PLUMBING RENOVATION FOR 18 STORY HOTEL.
$19.3 MILLION JOB COMPLETE HVAC INSTALLATION OF TWO PIPE FCU SYSTEM FOR TWIN TOWER APARTMENT BUILDING IN ASTORIA, QUEENS.
$17.3 MILLION JOB COMPLETE HVAC SYSTEM INSTALLATION FOR LUXURY APARTMENT BUILD- ING IN WILLIAMSBURG. FULL LG VRF INSTALLATION.
$23.99 MILLION JOB COMPLETE HVAC, PLUMBING, AND SPRINKLER INSTALLATION FOR 44 STORY APARTMENT BUILDING IN LIC, QUEENS
$14.3 MILLION JOB COMPLETE INSTALLATION OF HVAC SYSTEM INCLUDING FOUR PIPE FAN COIL UNITS AND ASSOCIATED CHILLERS AND INFRASTRUCTURE.
$7.4 MILLION JOB COMPLETE HVAC SYSTEM INSTALLATION FOR TEN STORY APARTMENT BUILDING, COMPRISED OF 65 LUXURY APARTMENTS.
$15 MILLION JOB INSTALLATION OF CLIMATE MASTER VERTICAL STACK HEAT PUMP SYSTEM FOR 40 STORY APARTMENT BUILDING.
$4.65 MILLION JOB COMPLETE MECHANICAL PIPING INFRASTRUCTURE FOR TWO HIGH-RISE APARTMENT TOWERS, PLUS FEATURED RETAIL FIT OUT. 650,000 SQ.FT..
$13.1 MILLION JOB COMPLETE INSTALLATION OF WATER COOLED SAMSUNG VRF SYSTEM FOR 38 STORY LUXURY CONDO TOWER.
$1.25 MILLION JOB PLUMBING INSTALLATION. SIXTEEN STORY HIGH-END APARTMENT BUILDING, 58,000 SQ. FT. APPROX. 4,000 SQ. FT. PER UNIT.
$2.9 MILLION JOB COMPLETE PLUMBING INSTALLATION FOR FIFTEEN STORY TOWER COMPRISED OF 26 LUXURY CONDOS.
Stephen J. Yager CEO/Partner
48 years in the Construction Industry. Managing Member of Centrifugal Associates Group, LLC since 2013. Mechanical contractor in NYC since 1974. As Owner, President and CEO of my family business, Centrifugal Associates, Inc. I have been involved directly and indirectly in successfully estimating, negotiating, and overseeing the construction of approximately 1.5 billion dollars of mechanical work in NY, Florida, and California. The mechanical applications experience ranges from commercial, residential hi-rise buildings, Federal Courthouse, Major Paper Mill, utility power plants and high-pressure steam installation and repair. 2009 to 2010 Government Certify 8A minority rm chiller replacement at LAX airport control tower, California. 2006 to 2008 Worked for WDF, Inc. as Consultant for Business Development in the private sector in NYC. Involved in $200 M. jobs. $84 M. from Plumbing work in Freedom Tower, World Trade Center. 1995 He was the Co-Founder and member of the Board of Directors of DualStar Technologies Inc. a Public Trade Company. Some of the successful nished Jobs with Centrifugal Associate, Inc.: NYSE 1974 - 1990 All HVAC - $10 M. Job - Installation of New Chiller Plant Mobil Oil Building 1974 - 1985 HVAC and Sprinkler - $20 M. Job - All HVAC Work Mt. Sinai Hospital 1980 - 2000 HVAC - $50 M. Job - Central Plant Work, New Hospital Building and Laboratories $32 M. Met Life Building 1985 HVAC - $5 M. Job - Installation of HVAC Equipment Federal Court House Islip, NY 2000
HVAC - $15 M. Job - Full HVAC installation Bloomberg Project Lexington Avenue 2002 HVAC and Electrical - $25 million Job - Full HVAC installation Jim Egan COO/Partner
28 years of costruction experience. Over 30 High-Rise residential projects with over 6,000 individual dweling units. Extensive experience with Chilled Water Systems, Heat Pump Systems, VRF, CO-Generation, Condensing and Packaged Boiler Systems. Mr. Egan returned full time to the Centrifugal Group as a Partner and Chief Operating Ocer in the spring of 2018. This followed a period from 2014 through 2018 where he worked as a consultant to CAG, assisting in setting up operations and construction programs. He had started with Centrifugal Associates Group right after graduating from the Georgia Institute of Technology with a degree in Mechanical Engineering in 1994. During the rst eight years of his career Mr. Egan progressed from assistant project manager, junior estimator and nally to managing some of the largest HVAC projects in New York City at the time. He spent the second part of his career at HRH Construction where he was the Director of MEPS Services. There he oversaw projects from development to nal CO, working with the city’s leading architects and consulting engineers to bring a project from initial concept to nished product. During the process, Mr. Egan worked with various public and private entities including NYC DOB, DEP, Con Edison, Verizon and Time Warner / Spectrum. Post HRH, Mr. Egan worked as an owner’s representative, overseeing the interests of developers such as Kushner Companies and Magnum Properties. Mr. Egan returns as COO/Partner to implement the dierent strategies he has learned from the various positions and roles he has had over his diverse career and lead CAG into the future.
7 WEST 36TH STREET, 6TH FLOOR NEW YORK, NY, 10018 Email: info@centrifugalgroup.com Phone: (212) 798-3150 Fax: (646) 869-4408
Page 1 Page 2 Page 3 Page 4 Page 5 Page 6 Page 7 Page 8 Page 9 Page 10 Page 11Made with FlippingBook - Online Brochure Maker