Nexus Magazine - Edition 04

What does long-term value look like when the future is becoming harder to predict? As infrastructure leaders navigate accelerating change across energy, water, communities and industry, Nexus Magazine explores how strategic foresight can help organisations make better decisions today. From electrification and resource security to legacy assets and investment priorities, we examine why the most valuable infrastructure will be the infrastructure that continues to hold its value as the world changes around it. 

Published by

Magazine TM

Edition 4

Shaping decisions

Building trust that outlasts construction

Published by

Contents Building trust that outlasts construction ........................................................... 3 Making nature’s hidden benefits count ......................................................... 4 Movement, not monuments – the new standard for Olympic legacy ............................. 8 Deeper that data Revealing infrastructure’s hidden human rights risks ................................................ 12 Data centre operators need to build a genuine relationship with communities ..................... 16 From stakeholders to rights holders Forging a new kind of partnership with Aboriginal and Torres Strait peoples .................... 20 Beyond engineering Making water systems work for communities....................................................... 24 Empowering youth to shape the future of water and energy ....................................... 28 Beneath the surface Building trust in PFAS investigations .............................. 33 After the mathpocalypse, is engineering next?............................................................ 36 About the authors ............................................................. 42

Welcome to the fourth edition of Nexus Magazine. This quarter we explore why meaningful engagement must be a whole-of-project responsibility, creating genuine opportunities for communities to influence project decisions, build trust, promote fairness and contribute a lasting positive legacy.

Carla Pignatelli Service Line Leader - Engagement and Communication, Innovation, Transformation S

uccessful infrastructure doesn’t get built in a vacuum. Every project touches people’s lives, shaping how they move around, access local services, feel safe and secure, and connect with the people and places around them.

Not everything about a project’s design or methodology will be open to influence. It’s important to be transparent about what is open for change and what is not. Working with communities to shape a meaningful process can be just as valuable. Communities facing PFAS investigations, for example, may have little say in how technical studies are conducted, but they can help shape how and when information is shared and how they participate. Genuine engagement also means closing the loop, showing how feedback has influenced decisions and explaining why some suggestions have not been taken forward. Participation also needs to extend beyond those most able or willing to take part in traditional consultation. A mix of communication and engagement approaches, supported by clear, accessible information and welcoming activities, can help reach diverse audiences and empower more people to participate meaningfully. Some relationships require deeper consideration of rights and decision-making authority. For Australia’s First Nations peoples, recognition as rights holders means respecting their relationship with Country and their ability to make decisions about its future. Partnerships can also include opportunities for ownership and equity, giving communities a lasting stake in infrastructure developed on their lands. Successful infrastructure is about more than technical excellence. It’s about creating genuine opportunities for communities to influence decisions, building trust along the way and leaving a positive legacy that lasts well beyond project delivery.

That’s why understanding communities, building trust and involving people in decisions can be just as critical to project success as technical excellence, improving both the prospects for delivery and the lasting value infrastructure creates. But communities living with infrastructure today aren’t the only ones with a stake in the decisions we make. Some contributors to this edition challenge us to consider how the interests of future generations, First Nations communities and the environment can also be better represented in decision-making. The strong grassroots opposition to data centre building we’re now seeing around the world demonstrates how companies can’t take community support for granted or expect rigid engagement playbooks to succeed. Publishing the facts and expecting this to change minds does not work when trust has not been earned. Communities need to see how projects have considered their perspectives, actioned their feedback and demonstrate how their involvement has influenced project decisions. The challenge is clear, but what does it mean for how we plan and deliver projects? The contributors to this edition offer different perspectives on what meaningful engagement can look like in practice. Meaningful engagement starts with understanding the community. Engagement and communication specialists should be involved early, alongside technical teams, to understand community structures, existing sentiment and the issues likely to shape how people experience a project. That understanding should inform a process that is fair, accessible and clear about what communities can and can’t influence.

Published by GHD.

© Copyright @ GHD.

All rights reserved. No part of this publication may be reproduced, stored in a retrieval system or transmitted in any form or by any means, electronic, mechanical, photocopying or otherwise without the prior permission of the Public Relations Department, GHD.

2 | GHD | Nexus Magazine

Nexus Magazine | GHD | 3

Making nature’s hidden benefits count

project, which encompassed a three-hectare constructed stormwater wetland, 600 metres of flood defence, as well as the restoration of tidal wetland and coastal forest. The assessment estimated the wider benefits – mostly from the restored habitats – had a present value of USD 6.8 million over 50 years beyond the project’s core water- management functions. Although we screened this after the wetland was approved and constructed, it offers an approach that can give communities and policymakers a more complete understanding of a nature-based project’s economic, social and environmental benefits. Putting evidence behind wider benefits The need for nature-based solutions has grown as climate change and urban growth put pressure on grey infrastructure. Communities increasingly expect benefits like climate resilience and liveability in addition to a project’s core outcomes.

One project, many returns How the Waitaki Street Wetland works along the Ōtākaro Avon River.

Auckland

The Waitaki Street Wetland combines a constructed stormwater wetland, flood defences and restored habitats. Threatened native birds have been sighted there since it was created.

Since a new wetland was created on the outskirts of Christchurch, New Zealand, native birds have flocked there. Threatened species, including the black-fronted tern, the white heron/kōtuku and the crested grebe, have been among those spotted.¹

Benefits

Christchurch

Catherine Drumheller

Water droplet: water quality

Shield or wave: flood protection

Leaf/CO₂: carbon storage

Wind: air quality

Walker or cyclist: recreation

Senior Advisor - Sustainability & Resilience T he area forms part of the wider Waitaki Street Wetland project, designed to improve water quality and reduce flood risk along the Ōtākaro Avon River. But as the influx of varied birdlife indicates, the project offers other long-term benefits. In Waitaki’s case, not all of them are as visible as richer biodiversity. They include improved air quality, climate change mitigation through increased carbon storage, and more recreational opportunities for residents. It’s a living example of how nature-based solutions support a broad range of public services beyond their central goals.

Wildlife callouts

Project components

Yet when assessing sustainable solutions and making investment decisions, much of that value often remains hidden or unquantified. A review of 114 cost-benefit analyses of nature-based solutions between 2000 and 2022 found incomplete coverage of benefits, often because assigning monetary values was difficult.² The study also found that assessments commonly overlooked environmental costs and changes in how nature-based infrastructure performs over time. Using Waitaki as a case study, we applied a screening methodology to capture and value the “co-benefits” of the

– 3-hectare constructed stormwater wetland – 600 metres of flood defence – Restored tidal wetland – Restored coastal forest – Ōtākaro Avon River – Christchurch suburbs

– Black-fronted tern – White heron / kōtuku – Crested grebe

Christchurch City Council

Not to scale

4 | GHD | Nexus Magazine

Nexus Magazine | GHD | 5

From habitat to dollars A faster way to put evidence behind nature's wider benefits. The screening method sits between quick qualitative judgement and costly detailed studies. It combines project data with published research to estimate the physical and monetary value of co-benefits. Part A: The middle ground Part B: The five steps

In traditional planning, costs and benefits are often spread across budgets and time. For example, a water project’s full contribution to health or recreation over time may receive little recognition within a narrowly defined water-infrastructure assessment. Assessing nature-based co-benefits often falls into two extremes – high-level qualitative assessments that rely on professional judgements or highly detailed and costly analyses that require extensive site-specific data. Under the first approach, the lack of detail means very real co-benefits risk being treated as “nice to have” rather than a tangible part of a project’s value. On the other hand, highly technical analyses may be impractical or cost-prohibitive, especially at an early stage of project design. The screening we applied to the Waitaki project addressed this gap by combining project data with relevant published references, producing evidence-based estimates at a lower cost and with less time commitment.

Identify which co- benefits matter locally, with the project team and community

Screening method, described as "Project data plus published research. Evidence-based, lower cost, faster"

Gather project data, such as the area of habitat restored

Fill gaps with published research where local data doesn't exist

Cost and time

Evidence depth

Measure the biophysical impact, such as tonnes of carbon or homes at lower flood risk

Built for floodwater, worth USD 6.8 million more Core functions – Improved water quality – Reduced flood risk along the Ōtākaro Avon River

Qualitative judgement, described as "Low cost, low detail. Benefits treated as 'nice to have'"

Detailed site- specific analysis, described as "High accuracy, but costly and slow, especially early in design"

Put a value on it, such as with NZ's official shadow carbon price

Listening to communities

A tool for better decision-making

The method takes an ecosystem services approach to measure the expected biophysical impact and the monetary value of benefits. The biophysical assessment covers a project's actual impact on the environment and its community, for example, how many tonnes of carbon emissions would be avoided or how many houses would be at reduced risk of flooding. Putting a specific dollar figure on these benefits uses various valuation methods. For example, New Zealand has an official shadow carbon price used for public policy and cost-benefit analyses, which we applied to the Waitaki screening.³ The first step is to identify which potential co-benefits matter for a project’s location and surrounding community. In Waitaki, we worked with the project team to identify which benefits to assess and gather information such as the area of habitat being restored. The relevant co-benefits will vary widely depending on the project. Where local measurements were unavailable, we drew on published research. For example, we can combine a constructed wetland's area with sequestration rates from relevant studies to estimate how much carbon it could absorb annually. We can then translate that into a monetary value based on the official carbon benchmark. Other calculations use research on the services provided by particular habitats, or the health benefits associated with access to green space.

To be clear, reference values do not provide the same level of accuracy as site-specific surveys. This makes it vital that the screening process be transparent about uncertainties associated with reference values. Moreover, there are many potential co-benefits that are difficult or inappropriate to express in monetary terms – but which are still accommodated by the framework. These benefits include an area's cultural significance and impacts on Indigenous people's customs and priorities. The geographic context is also crucial. Heat mitigation may matter more in one community, while access to nature or water quality matters more elsewhere. For a wetland close to a densely populated area like Waitaki, for example, it was essential to include recreational opportunities as a measured co-benefit. This makes it vital that communities are involved from the start in deciding what counts as a benefit – early enough to influence design, business cases and investment priorities. The more communities can gather and present evidence themselves, the more influence they can have on decision-making. In the United States, for example, the Chicago-based Center for Neighborhood Technology⁴ provides tools that communities nationwide can use to quantify the benefits of green infrastructure and take that evidence to their city councils.

While the Waitaki study was retrospective, it shows how this method can support more robust decision-making, especially when developed early with community engagement. The desire for nature-based solutions is strong and growing worldwide. What’s often missing is a clearer, well-grounded and holistic picture of the wider benefits these projects provide beyond their primary engineering functions. Capturing and documenting those benefits with methods like the one applied to Waitaki offers a way forward, giving communities and policymakers a tool to bring hidden value into the light.

Hidden co-benefits – Richer biodiversity – Improved air quality

– Carbon storage (climate change mitigation) – Recreation for residents USD 6.8M Present value over 50 years. *Mostly from restored habitats.

References

1. Christchurch City Council. 2026. “Ōtākaro Avon River Corridor December Update.” Kōrero Mai | Let’s Talk, January 5, 2026. https://letstalk.ccc.govt.nz/waitai-coastal-burwood-linwood-community-board/ otakaro-avon-river-corridor-december-update. Let’s talk 2. Chelli, Alessia, Luke Brander, and Davide Geneletti. 2025. “Cost-Benefit Analysis of Urban Nature-Based Solutions: A Systematic Review of Approaches and Scales with a Focus on Benefit Valuation.” Ecosystem Services 71: 101684. https://doi.org/10.1016/j.ecoser.2024.101684. ScienceDirect 3. The Treasury. 2022. “Information on the Shadow Price of Carbon (OIA- 20210278).” April 5, 2022. https://www.treasury.govt.nz/publications/oia-response/information-shadow- price-carbon-oia-20210278. The Treasury New Zealand 4. Center for Neighborhood Technology. n.d. “Center for Neighborhood Technology.” Accessed October 21, 2026. https://cnt.org/.

6 | GHD | Nexus Magazine

Nexus Magazine | GHD | 7

B ut the new stadium's defining legacy won’t be what happens inside it. It will be how easily people can move around it, how the precinct works on an ordinary weekday and how the overall investment improves life across South East Queensland. Historically, host cities focused on maximising the spectacle of major events like the Olympics, measuring success through stadium size, television audiences, tourism numbers and iconic images. Athens 2004 illustrated the risks of this approach, leaving behind huge debts and many deserted venues with little or no utility for residents after the athletes went home. For Brisbane, the standard is different. People now judge the legacy of major events by how well and how inclusively infrastructure serves city communities long after the event. That encompasses improvements to transport and mobility, environmental performance, housing outcomes, and the cultural and social impact of event-related development. The best host cities start with what communities need and work backwards from the mega-event. For Brisbane residents, that means shorter commutes, more accessible neighbourhoods and public spaces that work on ordinary days. Australia’s third-largest city needs to plan its Olympics around movement, not monuments.

Different cities, one strategic test

London 2012, Paris 2024 and Los Angeles 2028 all chose different delivery models, but each points to the same principle for Brisbane: legacy must shape decisions before designs and operating plans become difficult to change. One relevant test now is distribution: who can afford to live in regenerated neighbourhoods, who can reach the new opportunities and whether existing communities share in rising land values and improved services. London showed how a mega-event can accelerate an existing regeneration strategy. The Athletes’ Village became East Village and Queen Elizabeth Olympic Park created a new focus for housing, culture, sport and public space in East London. Paris showed that reusing venues still requires investment in access and surrounding communities. For 2024, the city relied largely on existing and temporary venues while directing new investment towards Saint-Denis, the Athletes’ Village, active travel and accessibility. The longer-term value will depend on how the Paris Village converts to everyday use and whether improved connectivity delivers lasting benefits.

Movement, not monuments – the new standard for Olympic legacy Excavators have broken ground at Victoria Park, also known by its Turrbal name Barrambin (meaning "windy place"), beginning Brisbane’s physical transformation for the 2032 Olympic and Paralympic Games. Max Goonan Marketing & Communications Lead - Major Events

8 | GHD | Nexus Magazine

Nexus Magazine | GHD | 9

Built for 2032, needed for 2046 The Games will last a few weeks. South East Queensland is set to grow by 2.2 million people by 2046.

Los Angeles is testing how operational changes and travel behaviour can create value without relying on extensive new construction. Plans for 2028 emphasise transit- first journeys, demand management, mobility hubs and first- and last-mile access.¹ Proposed measures include restricted venue parking, dedicated bus operations and safer walking and cycling connections. Brisbane can draw these lessons together by linking precinct decisions to a wider South-East Queensland strategy. Planned rail, bus and regional access projects should be tested against everyday population growth, housing and service needs, rather than justified only by event demand. The new Brisbane stadium at Victoria Park/Barrambin shows why this wider frame matters. The venue and infrastructure programme must align with the needs of the parkland, transport network, nearby health services and everyday city life. Hospital access, local journeys and park use cannot become secondary design considerations. The precinct’s permanent value will depend on how it connects to neighbourhoods, regional networks and the institutions that will operate across it after 2032. Importantly, the new Games precinct also presents an opportunity to recognise the cultural significance and history of Barrambin. First Nations history can inform how the site is designed, interpreted and experienced before, during and after the Games.

A human legacy Brisbane’s Olympic legacy will be experienced in everyday life: in the time people spend travelling, the places they can reach and their ability to participate in the city around them. The city still has time to set a higher standard for Olympic legacy, but the choices that determine that are being made now. Every major decision should face the same test: will this make South East Queensland easier to navigate, more accessible and more useful to the people who live here after 2032? If the answer is unclear, the plan isn’t finished. Brisbane’s legacy will be decided on ordinary days long after the crowds have gone, when success is measured not by the stadium’s capacity, but by the city’s capacity to connect people with opportunity. 1. Kyllmann, Carolina. 2026. “Los Angeles Works to Shed Its Car-Centric Identity as ‘Transit-First’ Olympics Approach.” Clean Energy Wire, 30 July. https://www.cleanenergywire.org/news/los-angeles-works-shed-its-car- centric-identity-transit-first-olympics-approach 2. Queensland Government. n.d. “The 2032 Delivery Plan.” Accessed 19 October 2026. https://www.delivering2032.com.au/2032-delivery-plan References

Improved connectivity is now central to any major event legacy. That is especially true for Brisbane, which aims to stage a climate-positive Olympic and Paralympic Games, and which already has one of

2032 Olympic Games

SEQ population

Australia’s fastest-growing populations. Better transport links and more walkable

– +2.2 million people – About 900,000 new homes needed – About 1 million new jobs needed

6.0m

neighbourhoods deliver a wide range of secondary benefits, including greater social inclusion, more sporting participation, better housing options, more active public spaces, greater economic opportunities and lower carbon emissions. Improved regional rail links between the city and South East Queensland’s Gold and Sunshine Coasts, which will also host Olympic events, are vital to that goal. Several major rail and bus projects, including new connections and upgrades, form part of the state’s 2032 Delivery Plan.²

3.8m

2023

2046

Years

Sources: ShapingSEQ 2023 (Queensland Government).

Designing the operating model now

The construction of the Tottenham Hotspur Stadium in London offers a practical lesson for Brisbane. The project brought crowd simulation, pedestrian analysis and multimodal transport data into the design process early. Our Movement Strategies team used this information to support construction planning around an operating stadium, match schedules, transport services and emergency access. Tottenham designed the precinct around how people would use it. Brisbane can apply the same principle by developing a live precinct operating model now, then testing it as venue designs, construction staging, and transport plans evolve. The model could test routine operations and disruption. It could also identify where infrastructure such as pedestrian bridges would provide lasting value after the Games. We applied similar modelling for the Paris 2024 opening ceremony, supporting the movement of around 10,000 athletes between the Athletes’ Village and the River Seine. The exercise shows why operational planning should inform infrastructure decisions early.

10 | GHD | Nexus Magazine

Nexus Magazine | GHD | 11

Revealing infrastructure’s hidden human rights risks Deeper than data A project can meet every technical requirement without fully accounting for how it may affect people in practice. Meaningful engagement brings local knowledge and lived experience into view, revealing risks and vulnerabilities that project data alone may miss.

Marcos Dornelles dos Santos Lead Architect and Team Leader, Central Canada

Chloe Sullivan Engagement and Social Sustainability Lead, Western Canada

H

How infrastructure intersects with human rights risks Human rights risks can emerge from the wider conditions surrounding a project, including its location, workforce and operating environment. In construction, for example, risks of forced labour and trafficking for forced labour can increase where worker vulnerability intersects with complex subcontracting arrangements, third-party recruitment, deceptive job offers or the withholding of identity documents.⁵ On one remote project our team worked on, a human rights assessment identified reports of trafficking near a worker camp. The activity fell outside the project’s immediate scope, yet its proximity made it relevant to the environment in which the project would operate. Assessing the full project context early can reveal where infrastructure may reveal existing human rights risks and help teams account for them throughout planning, design, delivery and operation.

Scott Torrence

uman trafficking is a global human rights challenge. The UN recorded more than 200,000 detected victims across 156 countries between 2020 and 2023. In 2022, the number of detected victims was

Lead Landscape Architect, Central Canada

25 percent higher than in 2019.¹ These figures capture only part of a problem that often remains hidden and underreported. Infrastructure intersects with human trafficking risks in practical ways. People engaged in trafficking may use transport networks to move victims for the purpose of exploitation. In Canada, the Trans-Canada Highway has been identified as a trafficking corridor connecting commercial sex markets across the country.² In 2021, an operation across roads and airports in 29 European countries identified 650 potential victims.³ Risks can also arise around remote work camps, where isolation and limited community connections may heighten existing vulnerabilities.⁴ These examples point to broader implications for infrastructure projects. Infrastructure that supports communities and economic activity can affect people in ways that are difficult to anticipate from project data alone. Human trafficking illustrates why these potential impacts need to be considered throughout planning and delivery.

12 | GHD | Nexus Magazine

Nexus Magazine | GHD | 13

Translate insight into action Our work on a rest area along a remote highway showed how local context can shape project requirements. The facility sat along a major transport corridor used by people travelling between northern communities, schools and workplaces. Its isolation influenced the layout of the waiting area and washrooms, with openness and clear sight lines incorporated into the design. More broadly, design responses need to reflect both the setting and how different people experience the same infrastructure. On Toronto’s ravines and trails, for example, women reported feeling less safe than men. Some racialised participants also identified discrimination or harassment as a barrier to using these spaces.⁸ Importantly, these experiences can influence whether and how people use infrastructure. In a 2021–22 Australian survey, 77 percent of women who used public transport alone after dark felt safe, compared with 93 percent of men.⁹ Safety measures should respond to these differences without making places feel defensive or unwelcoming. The goal is to integrate safety in ways that preserve beauty, nature and a strong sense of place. Three actions can help project leaders translate these insights into practice: – Conduct human rights due diligence early. Consider the project’s location, workforce, transport links, operating context and broader sphere of influence. Identify risks that the project may influence, including those beyond its direct control. Where the project team cannot address a risk directly, establish how it will be documented, escalated or referred to the appropriate organisation. – Engage potentially affected groups while decisions can still change. Use local knowledge and lived experience to identify issues that technical analysis may overlook, then demonstrate how that input influenced project priorities or requirements. – Translate risks into concrete project requirements. Measures may include spatial layouts, visibility, access, worker accommodation, contractor expectations and accessible reporting mechanisms.

Seeing beyond project data Maps, datasets, aerial imagery and desktop analysis provide essential information about a project and its surroundings. Building a comprehensive picture of how people experience that environment also requires direct observation, local knowledge and community perspectives. On a separate project near Thunder Bay, Canada, our team saw how site visits can add important context. Visiting the site made its remoteness, the distances people travelled and the concerns raised by local communities more tangible. These concerns sat within a wider pattern, with Thunder Bay recording Canada’s highest average annual rate of police-reported human trafficking between 2014 and 2024.⁶

How people perceive a place also matters. In a 2026 UK survey, respondents estimated that 30 percent of Londoners had personally experienced crime in the previous year, more than twice the measured proportion of 12.2 percent.⁷ While perceptions may not align with measured conditions, they can influence how people experience and use a place. Treating maps, datasets and other technical evidence as a complete picture of a place creates an illusion of data. Technical analysis can show where infrastructure will go and how it is intended to function. Local knowledge and lived experience reveal how that infrastructure may affect people and communities. Community engagement brings these forms of knowledge together, helping teams identify risks early enough to shape project priorities and requirements.

These intentional steps help teams identify and mitigate risks within a project’s influence, while government procurement can reinforce their use across infrastructure projects. In the UK, for example, modern slavery risks can inform tender requirements, evaluation questions and contract conditions for public works, helping embed human rights considerations throughout project delivery. 10 However, design choices and procurement requirements alone cannot address human trafficking or systemic inequality, which require sustained action

What the map doesn’t show The desktop view The lived view Technical analysis shows where infrastructure will go. Lived experience shows how it will affect people.

beyond any single project. A fuller picture leads to better decisions

6. Statistics Canada. “Trafficking in persons in Canada, 2024.” 2025. https://www150.statcan.gc.ca/n1/pub/85-002-x/2025001/article/00008-eng.htm 7. Policy Institute at King’s College London. London Has Fallen? Misperceptions of Crime, Race, Religion and Life in the UK Capital. 2026. https://www.kcl.ac.uk/policy- institute/assets/london-has-fallen-misperceptions-of-the-uk-capital.pdf 8. The Centre for Active Transportation. Who Uses and Benefits from Toronto’s Parks and Multiuse Trails? 2024. https://tcat.ca/wp-content/uploads/2024/12/Final-Deacon-Report-1.pdf 9. Australian Bureau of Statistics. “General feelings of safety, 2021–22 financial year. 2023.” https://www.abs.gov.au/statistics/people/crime-and-justice/general-feelings- safety/latest-release 10. UK Government. “PPN 009: Guidance on tackling modern slavery in government supply chains.” 2025. https://www.gov.uk/government/publications/ppn-009- tackling-modern-slavery-in-government-supply-chains/ppn-009-guidance-on- tackling-modern-slavery-in-government-supply-chains-html Responsible infrastructure requires a comprehensive understanding of the project context. By combining technical expertise with local knowledge and lived experience, project teams can recognise how infrastructure intersects with wider human rights risks and make more informed decisions. Applying those perspectives throughout planning, design and delivery can help teams create infrastructure that responds more effectively to the needs of the people who use it. This article draws on insights and contributions from Catherine Dang, Community Engagement Specialist at GHD.

Assign responsibility for implementing and monitoring these measures through design, construction and operation.

References

What the data shows – Maps – Datasets – Aerial imagery – Desktop analysis

What people experience – Remoteness

1. UN Office on Drugs and Crime. Global Report on Trafficking in Persons 2024. 2024. https://digitallibrary.un.org/record/4069246/files/1423049-EN.pdf 2. The Canadian Centre to End Human Trafficking. Human Trafficking Corridors in Canada. 2021. https://www.canadiancentretoendhumantrafficking.ca/wp-content/ uploads/2021/05/CCTEHT-Human-Trafficking-Corridors-ENG-FINAL.pdf 3. Europol. “Human Traffickers Grounded in 29-Country Sweep of European Airports and Roads.” 2021. https://www.europol.europa.eu/media-press/newsroom/news/human-traffickers- grounded-in-29-country-sweep-of-european-airports-and-roads 4. Maclean’s. “MMIWG’s Findings on “Man Camps” Are a Good Place for Government to Get Started.” 2019. https://macleans.ca/news/canada/mmiwgs-findings-on-man- camps-are-a-good-place-for-government-to-get-started/ 5. Verité. Human Trafficking and Other Labor Risks in the Construction Sector. 2026. https://www.responsiblesourcingtool.org/wp-content/uploads/2026/05/ construction-sector-report-2026.pdf

– Distances people travel – Community concerns – Who feels safe, and who doesn't

Where infrastructure will go and how it is intended to function

How that infrastructure may affect people and communities

14 | GHD | Nexus Magazine

Nexus Magazine | GHD | 15

T he approach highlights a core challenge facing data centre developers worldwide: building the necessary trust and relationship with affected communities takes more than the financial investment – it requires understanding what really matters to communities and what will create lasting value for them. Compared to traditional industries like mining, data centres face a particular difficulty in making that case. While construction can boost short-term employment, they tend to need far fewer long-term employees once operations begin. Communities are being asked to live with infrastructure that may benefit the wider economy, but which has negative impacts and whose long-term value is unclear. These doubts are driving strong community opposition to the data centre construction needed to supply surging demand for AI. In the United States, Data Centre Watch² reports that at least 75 data centre projects worth about USD 130 billion were blocked or delayed in the first quarter of 2026. The lack of clarity over what communities get out of data centres makes the question of what remains after construction especially important. Developers need to consider who will receive the benefits, how those benefits compare to the impacts residents will experience and how much influence communities have over the process. Identifying and developing these opportunities with communities requires a long-term effort to build relationships, ask questions and listen to the answers.

What remains after construction? The distinction between construction employment and permanent roles matters, as does who is likely to fill them. The communities hosting a proposed data centre will not necessarily be the people employed to build it. A project can create substantial activity across a regional construction market while offering relatively few opportunities to the neighbours who will experience its noise, traffic and changing landscape. Developers can improve that contribution by identifying which parts of a build local suppliers could deliver and where local recruitment, apprenticeships and training are feasible. These decisions can help retain more economic value within a community and give young people opportunities to develop skills. Developers also need to provide a meaningful answer to what happens when construction ends. A temporary increase in economic activity isn’t sufficient to show a project’s lasting value to the people living alongside it. That requires a deeper understanding of what a community is already trying to achieve. There may be local initiatives that need sustained investment or opportunities to use the development’s infrastructure to meet an existing need. Those priorities should be the starting point, with residents helping to determine how the operator can contribute.

Data centre operators need to build a genuine relationship with communities In Hazle Township, Pennsylvania, a developer has offered USD 10,000 to each eligible household as part of its effort to win approval for a new data centre.¹ Opposition to the project reportedly remains strong. Lauren Harding

Three towns, three offers, mixed results

Hazle Township, Pennsylvania (US)

San Marcos, Texas (US)

Chapelhall, Scotland (UK)*

Community garden and greenhouse warmed by surplus heat (under study) · Building height cut by 4m · 1,000m of native hedgerow

USD 10,000 per eligible household

Local jobs · Closed- loop cooling · Visual and acoustic screening

Offered

Contested: opposition remains strong

Rejected: council denied land-use change

Shaped by residents: changes made in response to feedback

Outcome

Approach

Cash incentive

Package of commitments

Co-designed with community

* Under study.

Executive Advisor - Social Sustainability, Engagement & Communication

Paying communities

Shaping value with communities

16 | GHD | Nexus Magazine

Nexus Magazine | GHD | 17

Different measures serve different purposes

A commitment to create jobs, for example, provides a direct financial benefit but does not resolve concerns about water demand or noise. Equally, pledging to reduce those impacts may address an important objection without giving residents a positive reason to welcome the development. The challenge is understanding how these measures fit together in a particular place – something that can only come from building long-term relationships. Some communities may conclude that the remaining costs outweigh the benefits, even after substantial changes and investment. Communities need a role in shaping the value Deciding what constitutes lasting local value is difficult when a community has different needs, interests and expectations. Residents will not necessarily arrive with a clear, shared list of priorities, ready for a developer to fund. Benefits will reach different people and provide value over different periods. Developers need to understand those differences and give residents a meaningful role in weighing them. That makes the way people participate central to the benefits discussion. Conventional engagement can result in hearing disproportionately from residents with the time and resources to attend meetings and

A credible approach also needs to distinguish between reducing a project’s impacts and creating economic and social opportunities. A water management plan can help address a development’s resource demands. Acoustic screening can reduce noise disturbance. Design changes can improve a data centre’s aesthetic appeal as well as its energy and resource footprint. Investment in community initiatives serves another purpose. Developers should be clear about what each measure achieves, how the community values them and which concerns remain unresolved. In San Marcos, Texas, Highlander SM One pledged to create local jobs, reduce the water footprint of its proposed USD 1.5 billion data centre through closed- loop cooling and install visual and acoustic screening structures.³ Those commitments were insufficient to overcome opposition and the council rejected a land-use change needed for the development to proceed. The outcome shows that developers can’t assume that a collection of commitments will add up to a proposition residents support.

Impact fix or community benefit?

"A temporary increase in economic activity isn't sufficient to show a project's lasting value."

warmed by surplus heat from its planned Chapelhall data centre.⁴ In response to community feedback, it has also reduced the building’s maximum height by four metres and committed to planting 1,000 metres of native hedgerow, at least double the length being removed. This illustrates how residents can help identify a potential use for a development’s resources that matters to them, on both the impact and benefits side of the equation. As the data centre build-out accelerates, developers will face increasing pressure to articulate what their projects offer communities. A persuasive answer needs to go beyond the total value of a benefits package. It should establish who benefits, how they benefit and for how long. Giving communities a genuine role in answering those questions is essential to making the data-centre bargain one they see as fair.

voice their views. The risk is that the resulting deal may overlook people who are less visible in the process. Consider a neighbourhood with many young families, where parents are balancing jobs and caring responsibilities. A 5 p.m. town hall meeting may be difficult to attend. A weekend event with food and space for children to play could make participation more practical. The people included in those conversations help determine what the community asks for, whose concerns receive attention and where investment might go. Developers should also be clear about which decisions residents can influence. Asking a community to help shape an investment means allowing sufficient time and flexibility for its ideas to change the proposal. In Scotland, for example, DataVita is studying residents’ suggestions for a community garden and greenhouse References 1. Wall Street Journal. September 2026. “Every household in this rural town receives $10,000 if a data centre gets built”. Will Parker. September 27, 2026. https://www.wsj.com/real-estate/every-household-in-this-rural-town-receives-10- 000-if-a-data-center-gets-built-86554cb7 2. Data Centre Watch. Q1 2026. “Map of active opposition to data centres in Q1 2026.” https://www.datacenterwatch.org/q1-2026

Lasting mitigation – Water management plan – Closed-loop cooling – Acoustic screening – Design changes

Lasting value – Investment in local initiatives – Apprenticeships and training – Surplus heat for community use – Using site infrastructure to meet an existing local need

(height, aesthetics, energy footprint)

– Native hedgerow planting

Reduces harm

Creates opportunity

Short-term boost – Construction jobs

Construction disruption managed Traffic and noise management during the build

– Local supplier contracts – One-off cash payments

3. KUT News. 2026. “San Marco City council blocks proposed data centre”. Leigh Walden, 18 February 2026. https://www.kut.org/energy-environment/2026-02-18/ san-marcos-city-council-blocks-proposed-data-center 4. DataVita. 2026. “DataVita submits plans for DV4, its third data centre at Chapelhall”. September 2, 2026. https://blog.datavita.co.uk/blog/datavita-submits-plans-dv4- data-centre-chapelhall

18 | GHD | Nexus Magazine

Nexus Magazine | GHD | 19

Forging a new kind of partnership with Aboriginal and Torres Strait peoples From stakeholders to rights holders

Solar farms, wind turbines, transmission lines and battery storage – Australia has a lot of concrete to pour to hit net zero by 2050. But the most important foundation for the clean energy future may be something less tangible: building mutual trust with the Aboriginal and Torres Strait peoples stewarding the landscapes where new power projects will rise.

Leon Filewood Indigenous Engagement Lead - Infrastructure & Communities

W

Beyond ticking the boxes Existing regulatory processes establish consultation and approval requirements, but leading practice looks beyond minimum compliance with the principle of Free Prior and Informed Consent (FPIC). At its heart, FPIC is about self-determination ensuring Aboriginal and Torres Strait peoples receive timely information, have adequate time to deliberate and can exercise agency by making decisions about activities affecting their Country and communities. But First Nations peoples want to go beyond a tick-box approach that views them merely as “stakeholders” to be consulted and instead be recognised as “rightsholders” with the ability to negotiate meaningful participation in projects, including opportunities for ownership and equity. An estimated 43% of new clean energy and transmission infrastructure will sit on the Indigenous Estate. Where net zero meets Country 43%

ith 43 percent of net zero infrastructure due to be located on Indigenous lands, developers have a once-in-a-generation opportunity to go beyond the minimum consultation requirements enshrined

in law and reimagine relationships with Traditional Custodians on a more equitable footing.¹ For companies involved in the energy transition, forging fairer forms of collaboration isn’t an optional extra. Australia needs AUD 142 billion of new generation, grid and storage capacity by mid-century, according to the Australian Energy Market Operator (AEMO).² By investing time in nurturing relationships from the earliest stages of a possible project, developers can tap into local expertise, avert potential frictions and establish a durable social license to operate – all crucial factors for long-term profitability. Get this process wrong and opposition from Traditional Custodians may derail plans completely or convince investors that the risks are too high to proceed. After decades of watching their lands being exploited by the mining industry, Aboriginal and Torres Strait communities are working proactively to ensure the coming wave of net zero investment (and parallel appetite for critical minerals) does not repeat old patterns of disenfranchisement, dispossession and desecration of sacred sites. In November 2021, the First Nations Clean Energy Network, an Australia-wide nonprofit, began working with community organisations, industry groups, technical advisers and others to support Aboriginal and Torres Strait peoples to strike new kinds of deals with corporations operating on their territories.³

20 | GHD | Nexus Magazine

Nexus Magazine | GHD | 21

ACEN–Yindjibarndi: "From handshake to financial close"

Bridging the divide While smart companies are devoting time to deepening their understanding of First Nations values, capacity- building initiatives such as the First Nations Clean Energy Network PowerMakers programme are equipping host communities with the knowledge and skills they need to negotiate from a position of strength.⁶ For the past three years, the scheme has been bringing together mentors from across Australia’s energy landscape and members of a network known as Indigenous Clean Energy based in Canada, where First Nations, Métis and Inuit communities have developed or co-own hundreds of major renewable energy projects and thousands of smaller, community- based installations.

For Australia’s Aboriginal and Torres Strait peoples, such programmes are buttressing hopes that their country’s embrace of net zero could finally deliver genuine forms of community-based economic sovereignty. For companies vying for a share of the clean energy boom, the price of entry is no longer measured solely in terms of technological know- how or investor confidence. Successful projects will depend on developing the pools of relational capital needed to bridge the divides between newly arrived developers working to hard deadlines and annual reporting cycles – and peoples whose relationship with the land lives in the realm of the timeless.

Deal-at-a-glance panel

June–July 2023: Agreement signed, Yindjibarndi Energy Corporation formed and partnership announced

May 2026: Financial close on the Jinbi solar project, with a 30-year agreement to sell its power to Rio Tinto

– Up to 3 GW – About 13,000 km² – 25% to 50% Yindjibarndi equity in every project – Yindjibarndi approval of all sites – 50/50 ownership of the joint company

Mid-2028: Jinbi expected to be fully operating

2023

2026

2028

By taking time to learn how colonial histories have affected a particular area and recognising the unique experiences and cultures of each host community, companies will increase their chances of establishing relationships based on mutuality and reciprocity rather than the paternalism of the past. Companies must also recognise the deep cultural and spiritual significance of Aboriginal and Torres Strait people’s relationship with Country and respect the longstanding obligations, customs and responsibilities that connect people and the land. Project proponents should bear in mind that these custodians are often committed to building social cohesion by sharing the benefits with the broader community. In one case, First Nations representatives insisted that a health service associated with a project should be open to everyone in the area – not just their own people.

Advocates of this approach point to a partnership announced in July, 2023 between ACEN, a sustainable energy company based in the Philippines, and the Yindjibarndi people of the Pilbara region in Western Australia to create one of Australia’s largest Indigenous- led renewable energy initiatives.⁴ Under the deal, ACEN and the Yindjibarndi Aboriginal Corporation will jointly develop up to three Gigawatts of wind, solar, and renewable energy storage projects across about 13,000 km2 within the Yindjibarndi Native Title Determination Areas.⁵ The Yindjibarndi will retain a veto over all proposed sites and be entitled to an equity stake worth 25 to 50 percent of each project. Yindjibarndi-owned businesses will be preferred contractors and Yindjibarndi people will gain access to training and jobs. Reaching this kind of agreement requires companies to invest time in getting to know communities from the very beginning, preferably well before specific proposals are drawn up. Project proponents must also understand that they may be stepping into contexts where Traditional Custodians have suffered generations of broken promises by outsiders.

PowerMakers as the arrow that helps communities move further along

From stakeholder to rights holder

Canada's First Nations, Métis and Inuit communities at "ownership" (owning or co-owning hundreds of major projects)

ACEN–Yindjibarndi at "equity partnership" (25% to 50%)

References 1. Pascale, A., Davis, D., Watson, J., Smart, S., Brear, M., et al. (2023). Downscaling – Net-zero transitions, Australian communities, the land and sea. Net Zero Australia (University of Melbourne, University of Queensland, Princeton University and Nous Group), 19 April 2023. 2. Australian Energy Market Operator (AEMO). (2026). 2026 Integrated System Plan for the National Electricity Market. 25 June 2026. 3. First Nations Clean Energy Network. (2021, 17 November). Launch of ambitious new First Nations Clean Energy Network [Media release].

4. Yindjibarndi Aboriginal Corporation & ACEN Corporation. (2023, 17 July). Traditional Owners to lead large-scale renewable energy development in WA's Pilbara region [Media release]. 5. ACEN Corporation. (2023, 18 July). ACEN and Yindjibarndi people forge historic partnership for renewable energy development in West Australia [Media release]. 6. First Nations Clean Energy Network. (n.d.). PowerMakers. Retrieved November 2026, from www.firstnationscleanenergy.org.au/powermakers

Data sources – United Nations Declaration on the Rights of Indigenous Peoples (UNDRIP). – First Nations Clean Energy Network, Aboriginal and Torres Strait Islander Best Practice Principles for Clean Energy Projects.

22 | GHD | Nexus Magazine

Nexus Magazine | GHD | 23