AMP 2019-2029

Electricity Asset Management Plan 2019-2029

160

Vector Limited://

Option 4: Non-network options. Growth in this area is predominantly commercial where a single customer’s supply requirements may offset the capacity delivered by a non-network solution such as a network battery solution. Similarly for demand side management (DSM) solutions such as hot-water load control Option 1: Distribution feeder upgrades: Reinforce the 11kV distribution network at Ascot, Robertson and Oruarangi Rds, and Mangere Bridge

Rejected

Forecast capacity shortfall on the distribution network at Mangere

$4.5M Selected

FORECAST INVESTMENT SUMMARY ($MILLION NOMINAL)

DESCRIPTION

FY20

FY21

FY22

FY23

FY24

FY25

FY26

FY27

FY28

FY29 TOTAL

Install a third transformer in Mangere Central zone substation Establish Mangere South zone substation 11kV feeder reinforcement – Mangere Central (Mangere Bridge) 11kV feeder reinforcement – Mangere East (Robertson Rd) 11kV feeder reinforcement – Mangere West (Oruarangi Rd)

1.16

1.16

1.00

7.95

7.95

16.90

1.76

1.76

2.62

2.62

0.16

0.16

Total CAPEX

1.32

0.00

0.00

1.76

2.62

1.00

7.95

7.95

0.00

0.00

22.60

NEEDS STATEMENT – WIRI Wiri covers the established areas of Manukau, west to commercial area of Wiri and south to the residential area of Clendon. Growth is being driven by the greenfields commercial developments to the west of Roscommon Rd. Wiri zone substation is nearing capacity, initiating construction of Wiri West substation in Jerry Green St (Wiri West - new zone substation).

A new 11kV feeder is proposed from Manukau substation

TARGETED OUTCOMES

CUSTOMER EXPERIENCE

SAFETY

RELIABILITY

RESILIENCE

OPERATIONAL EFFICIENCY

CYBER SECURITY AND PRIVACY

OPTIONS ASSESSMENT For major projects, i.e. above $4M (level to be confirmed), include the following in this section: Technical feasibility, economic analysis, OPEX and CAPEX costs, net present value or net present cost, service levels, risks, etc.

DESCRIPTION

DISCUSSION OF OPTION

ESTIMATED COST (NPV IF APPLICABLE)

STATUS

Forecast security shortfall arising at Wiri substation

Option 1: Construct a new substation at Wiri West. This solution will provide additional capacity for greenfields commercial growth along Roscommon Rd while providing additional security to Wiri substation. Option 2: Non-network solutions. This is a commercial area making currently available non-network solutions impractical Option 3: 11kV feeder reinforcement – Great South Rd. A feeder reinforcement to address forecast capacity constraints

$11.6M Selected

Rejected

Forecast capacity shortfall on the distribution network at Manukau

$1.8M Selected