AMP 2019-2029

Electricity Asset Management Plan 2019-2029

170

Vector Limited://

NEW CUSTOMER CONNECTIONS

NEEDS STATEMENT Auckland’s population is growing at a rapid rate. The demand for new housing is outstripping available supply resulting in construction of new high density subdivisions in previously greenfields areas (residential subdivisions) or refurbishing and intensification of existing established areas. The connection forecast for the next ten years is shown in Section 2. Vector is keen to support this growth by investing in reinforcing our network to support subdivision reticulation enabling the connection of these new customers (new connections). Commercial growth differs from residential growth by virtue of the size of the load presented to the network and the way in which we deliver the capacity to meet the customer’s needs. The solutions focus more on the installation of substations, whether new (customer substations) or capacity upgrades of existing substations (capacity changes). Smaller commercial customers may be supplied from street reticulation (business subdivisions) much the same as for residential subdivisions. As part of the reticulation we may be asked to install streetlighting circuits. Vector also takes into consideration the changing energy needs of both residential and commercial customers, such as the predicted increase in the number of Electric Vehicles for private and commercial use, in the design of networks for subdivisions.

OPTIONS CONSIDERED The following options are considered for new customer connections.

DESCRIPTION

OPTIONS

ESTIMATED COST (NPV IF APPLICABLE)

STATUS

Option 1: Do nothing

Vector is keen to support growth in Auckland. Do nothing is not a viable option for the development of Auckland into a world class city. The supply and installation of infrastructure for new connections to customers is part of Vector’s core business

Rejected

Option 2: Install new connections and new subdivisions

$56.94M p.a. average

Selected

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)

DESCRIPTION

FY20

FY21

FY22

FY23

FY24

FY25

FY26

FY27

FY28

FY29 TOTAL

Auckland Network Streetlighting

0.29

0.29

0.29

0.29

0.29

0.29

0.29

0.29

0.29

0.29

2.90

Northern Network Streetlighting

0.59

0.59

0.59

0.59

0.59

0.59

0.59

0.59

0.59

0.59

5.90

Northern Subdivisions - Business

0.75

0.65

0.65

0.65

0.59

0.59

0.59

0.59

0.59

0.59

6.24

Auckland Subdivisions - Business

0.88

0.76

0.76

0.76

0.60

0.60

0.60

0.60

0.60

0.60

6.76

Northern Customer Substations

5.20

4.40

3.60

3.34

3.02

3.02

3.02

3.02

3.02

3.02

34.66

Northern Capacity Changes

1.48

1.48

1.48

1.48

1.48

1.48

1.48

1.48

1.48

1.48

14.80

Auckland Capacity Changes

3.07

3.07

3.07

3.07

3.07

3.07

3.07

3.07

3.07

3.07

30.70

Auckland Customer Substations

7.80

6.60

5.40

4.99

3.94

3.94

3.94

3.94

3.94

3.94

48.43

Northern New Connections

6.64

6.61

7.00

7.00

7.00

7.00

7.00

7.63

7.63

7.63

71.14

Auckland New Connections

9.32

9.27

8.83

8.83

8.83

8.83

8.83

8.11

8.11

8.11

87.07

Auckland Subdivisions - Residential

11.33

11.33

10.07

9.44

8.81

8.18

8.18

7.55

6.48

6.48

87.85

Northern Subdivisions - Residential

19.88

19.88

17.67

16.56

15.46

14.36

14.36

13.25

11.36

11.36

154.14

Customer Substations Major

1.00

1.00

1.00

1.00

1.00

1.00

6.00

CRL Supplies

2.78

2.78

Auckland Airport third supply

0.20

4.80

5.00

America’s Cup village

1.00

1.00

Elliot Tower 22 kV supply

0.50

1.00

0.50

2.00

WRR Lincoln Rd interchange to Westgate

0.06

0.06

Light Rail transit station supply

0.50

0.50

1.00

2.00

Total CAPEX

71.77

71.23

60.41

58.00

54.68

52.95

52.95

51.12

48.16

48.16

569.43

Made with FlippingBook - professional solution for displaying marketing and sales documents online