AMP 2019-2029

Electricity Asset Management Plan 2019-2029

174

Vector Limited://

direct field staff, to repair, refurbish or replace components, replace entire asset, and for some assets refurbish entire asset off-site or refurbish oil in-situ. Maintenance frequencies are not stated in this Needs Statement.

TARGETED OUTCOMES

CUSTOMER EXPERIENCE

SAFETY

RELIABILITY

RESILIENCE

OPERATIONAL EFFICIENCY

CYBER SECURITY AND PRIVACY

OPTIONS CONSIDERED Options to address the need identified above have been assessed and are summarised in the following table.

DESCRIPTION

DISCUSSION OF OPTION

ESTIMATED COST (NPV IF APPLICABLE)

STATUS

Option 1: Business as usual – do not increase the investment in maintenance

Our service levels and reliability indices show that a number of performance issues are developing within our asset base that requires Vector to take a different approach and/or additional programmes of maintenance to prevent service level gaps from deteriorating any further. A business as usual approach will simply not suffice going forward Corrective maintenance must be increased and adapted to increase works volumes to target the root causes of the identified service level gaps and to undertake additional and alternative maintenance initiatives to address the increasing number of open, high risk actions. This is needed address the existing service level gaps and correct performance to re-establish and maintain the expected service level

Rejected

Option 2: Alter our maintenance practices and undertake additional proactive investment

$982.37M Selected

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL) Our operational expenditure as per the investment summary below is a combination of core maintenance, i.e. all FSP reactive, planned and corrective maintenance activities, management of strategic spares, storage. It also contains non- core maintenance activities relating to exceptional and extreme network events, specialist contractor or extraordinary maintenance activities over and above that provisioned through core maintenance services. It also includes all reactive, planned and corrective work associated with the Penrose-Hobson tunnel and covers cost recovery associated with reactive third party damage activity.

MAINTENANCE CAPEX

DESCRIPTION

FY20

FY21

FY22

FY23

FY24

FY25

FY26

FY27

FY28

FY29 TOTAL

Corrective maintenance (CAPEX)

34.00

34.00

34.00

34.00

33.16

33.02

32.78

32.34

33.19

33.59

334.08

Reactive maintenance (CAPEX)

16.27

16.43

16.60

16.77

16.94

17.12

17.29

17.47

17.65

17.83

170.37

Total CAPEX

50.27

50.43

50.60

50.77

50.10

50.14

50.07

49.81

50.84

51.42

504.45

MAINTENANCE OPEX

DESCRIPTION

FY20

FY21

FY22

FY23

FY24

FY25

FY26

FY27

FY28

FY29 TOTAL

Planned maintenance (OPEX)

16.48

17.27

17.49

18.58

22.73

22.92

18.07

18.02

18.11

18.24

187.91

Corrective maintenance (OPEX)

12.64

13.42

13.56

13.7

13.84

13.79

13.64

13.77

13.91

14.06

136.33

Reactive maintenance (OPEX)

13.90

13.53

13.65

13.78

13.91

14.04

14.17

14.29

14.43

14.55

140.25

Total OPEX

43.02

44.22

44.70

46.06

50.48

50.75

45.88

46.08

46.45

46.85

464.49