AMP 2019-2029

Electricity Asset Management Plan 2019-2029

206

Vector Limited://

Zealand Transport Authority regulations for rail safety. Furthermore, the tunnel is classed as a confined space that requires strict entry requirements and these specified auxiliary systems to be operational 24/7.

For an auxiliary system failure there is a health and safety risk, which could result in the Asset Safety Incident Rate being increased (see Section 2.3.2). To ensure the integrity and safe operation of personnel and plant within this strategic asset there is a need to replace and refurbish auxiliary systems inclusive of the rail and its anchor systems.

TARGETED OUTCOMES

CUSTOMER EXPERIENCE

SAFETY

RELIABILITY

RESILIENCE

OPERATIONAL EFFICIENCY

CYBER SECURITY AND PRIVACY

OPTIONS CONSIDERED Options to address the need identified above have been assessed and are summarised in the following table.

DESCRIPTION

DISCUSSION OF OPTION

ESTIMATED COST (NPV IF APPLICABLE)

STATUS

Option 1: Do nothing

Not undertaking replacement or refurbishment works will result in continued and escalating maintenance costs and the risk that plant will be operated to failure. This runs the risk that that the tunnel cannot be safely operated and entered for regular maintenance or emergencies. Failure of auxiliary systems poses a risk to the continued operation of Vector and Transpower primary plant required for supply to Auckland CBD, North Auckland and Northern customers. Do nothing implies a Health and Safety risk to personnel and contravention of the New Zealand Transport Authority statutory Rail Act and risk of loss of reputation with Transpower, Electricity Commission, New Zealand Government and Auckland City Council. Selecting this option will remove the risks associated with the ‘Do nothing’ option. Undertaking a staged and scheduled programme of works will ensure continued operation and maintenance of the primary plant in the tunnel. It will also correctly manage the Health and Safety risks to personnel that work in the tunnel

Rejected

Option 2: Undertake a staged and scheduled programme of works to replace and refurbish auxiliary systems in the tunnel

$3.56M Selected