Electricity Asset Management Plan 2019-2029
267
Vector Limited://
Asset Condition (Schedule 12a)
Vector Electricity 1 April 2019 – 31 March 2029
Company Name AMP Planning Period
SCHEDULE 12a: REPORT ON ASSET CONDITION
This schedule requires a breakdown of asset condition by asset class as at the start of the forecast year. The data accuracy assessment relates to the percentage values disclosed in the asset condition columns. Also required is a forecast of the percentage of units to be replaced in the next 5 years. All information should be consistent with the information provided in the AMP and the expenditure on assets forecast in Schedule 11a. All units relating to cable and line assets, that are expressed in km, refer to circuit lengths.
sch ref 7 8
Asset condition at start of planning period (percentage of units by grade)
% of asset forecast to be replaced in next 5 years
Voltage Asset category
Asset class
Units
H1
H2
H3
H4
H5
Grade unknown Data accuracy (1–4)
9
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35
All All All HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV
Overhead Line Overhead Line Overhead Line
Concrete poles / steel structure
No. No. No. km km km km km km km km km km km No. No. No. No. No. No. No. No. No. No. No.
0.02% 0.48%
0.06% 1.46%
20.90% 80.27%
40.22% 13.56%
38.80%
4 4 4 3 3 2 2 2 2 2 2 2 4 4 3 3 3 3 3 3 3
6.33% 9.70%
Wood poles
4.22%
Other pole types
- - - - - - - - - - - - - - - - - - -
- - -
-
-
100.00%
- - -
Subtransmission Line Subtransmission Line Subtransmission Cable Subtransmission Cable Subtransmission Cable Subtransmission Cable Subtransmission Cable Subtransmission Cable Subtransmission Cable Subtransmission Cable Subtransmission Cable Zone substation Buildings Zone substation Buildings Zone substation switchgear Zone substation switchgear Zone substation switchgear Zone substation switchgear Zone substation switchgear Zone substation switchgear Zone substation switchgear Zone substation switchgear Zone substation switchgear
Subtransmission OH up to 66kV conductor Subtransmission OH 110kV+ conductor Subtransmission UG up to 66kV (XLPE) Subtransmission UG up to 66kV (Oil pressurised) Subtransmission UG up to 66kV (Gas pressurised)
88.62% 72.35%
3.13%
8.25%
-
27.65% 62.95%
1.66%
5.28%
30.12% 95.17%
1.66%
-
- -
4.83%
-
100.00% 62.85%
-
-
100.00% 83.23%
Subtransmission UG up to 66kV (PILC) Subtransmission UG 110kV+ (XLPE)
17.64%
16.58% 27.96% 93.87%
2.93%
- -
- -
72.04%
- -
Subtransmission UG 110kV+ (Oil pressurised) Subtransmission UG 110kV+ (Gas Pressurised)
6.13%
N/A N/A
Subtransmission UG 110kV+ (PILC) Subtransmission submarine cable
- - - -
4.95% 1.75%
95.05% 79.82% 100.00% 15.64%
-
-
Zone substations up to 66kV Zone substations 110kV+
18.42%
3.00%
-
-
- -
22/33kV CB (Indoor) 22/33kV CB (Outdoor)
7.41%
76.95% 27.78%
21.53%
43.75%
6.94%
22.22%
33kV Switch (Ground Mounted) 33kV Switch (Pole Mounted)
N/A
14.05%
50.50%
5.35%
30.10%
14.05%
33kV RMU
- - -
- -
100.00% 45.00%
-
- - -
50/66/110kV CB (Indoor) 50/66/110kV CB (Outdoor)
55.00%
100.00% 21.30%
-
-
3.3/6.6/11/22kV CB (ground mounted) 3.3/6.6/11/22kV CB (pole mounted)
13.80%
21.46%
43.44%
21.46%
N/A