Logistics plans outline the locations and traffic patterns of jobsite equipment, materials and temporary infrastructure. Instead of traditional, flat 2D site logistics plans, EMJ provides 3D model-based graphics during the bidding stage as well as the project planning stage. These graphics show all roads, fences, laydown, cranes, and more, and our team collaborates with all project stakeholders in the process. Enhanced Site Logistics Planning
ACTION
RESULT
CREATE EMJ creates a 3D building model to best represent the project parameters. VISUALIZE EMJ geo-locates the project and adds critical information such as: • Surrounding roads and buildings • Cranes or other construction equipment • Jobsite trailers, fencing, dumpsters, and portable toilets • Traffic patterns, ingress/egress plans • Safety information INTERACT & ANALYZE EMJ facilitates visual interaction with the entire project team, which allows each team member to use their unique expertise in the planning of project details.
EMJ builds a site logistics plan for the project that is comprehensive and inclusive of the requirements and expectations of all parties. By delivering high- quality image snapshots and hosting interactive meetings, we assure clients that due diligence has taken place in regard to the planning of the construction site logistics.
BENEFITS Realistic 3D graphics provide clear depictions of project layouts, which result in streamlined construction sites. Site logistics planning can aid in phasing, sequencing, safety, and efficiency, as well as minimizing disruptions to existing occupants and adjacent neighbors.
Value 82% of US-based Contractors consider BIM activities to be a top pre-construction activity.
McGraw Hill Construction, Business Value of BIM for Construction in Global Markets, 2014