The coordination of complex building systems can be difficult to visualize using 2D drawings. EMJ’s 3D clash detection process analyzes building models and locates potential conflicts, enabling the project team to resolve them before they become expensive problems. 3D Clash Detection
ACTION CREATE EMJ utilizes existing design 3D models or creates 3D content from contract drawings. INTEGRATE Trades complete their shop drawings in 3D, including: • Structural Concrete/Steel • Mechanical Ductwork • Mechanical Plumbing • Electrical • Fire Protection • Sitework Each piece is then overlaid to create a multi-trade, federated model. SHARE EMJ acts as the central coordinator by facilitating clash detection and resolving conflicts prior to construction.
RESULT By facilitating the
clash detection meeting process, EMJ assures that each trade performs their part on the project, drastically reducing errors often caused by lack of collaboration.
BENEFITS Tradework is completed with limited conflicts, resulting in a shorter and less expensive construction process. Various trades can work in vaccuums without communicating between one another. By implementing 3D clash detection, our team assures that each trade collaborates and avoids potential errors.
82% of contractors pinpoint Trade Coordination as being their #1 BIM use. Value McGraw Hill Construction, Business Value of BIM for Construction in Global Markets, 2014
23
Made with FlippingBook - Online Brochure Maker