Building owners often find it taxing to make changes to drawings as changes occur over time, which leave plans outdated and inaccurate. EMJ ensures that clients’ drawings and 3D models are maintained and reflect current conditions. Updated drawings are invaluable once the building is ready to embark on a renovation or addition project. FM Drawing Maintenance

ACTION DISCOVER

RESULT EMJ maintains accurate and information-rich drawings and 3D models for the client throughout the facility’s operation.

EMJ facilitates interactive discovery sessions with the facility management team to determine which areas of the building need updated drawings. The team pays careful attention to the drawings, which formats are desired, etc. PRODUCE EMJ’s team uses a number of methods to obtain accurate dimensions and information to include: • Laser Scanning • Field Measurement • Hand Drawings

BENEFITS Drawings and information are up-to-date and reflective of current conditions.

Value Newwork is easily and accurately visualized by project stakeholders. Decision Phase work can begin andmay include: • Conceptual model-based estimating • Life-cycle cost analysis • Energy analysis • Project Visualization A Building Information Model (BIM) is a bottomless filing cabinet for information, says Peter Strazdas, Associate Vice President Facilities Management at Western Michigan University.

How to Use BIM in Facilities Management, facilitiesnet.com, 2011