The new San Mamés Stadium, home of Athletic Bilbao since 2014, seats over 50,000 spectators. Athletic are a permanent presence in Spain’s La Liga and have won the Copa del Rey 23 times. The original stadium was built in 1913 and demolished a century later, making way for this modern replacement. As young engineers, each of ArcAero’s Directors contributed to solving wind engineering challenges on the project. Our first task involved wind tunnel testing of an early design to assess the wind microclimate within the seating bowl and surrounding public areas. At the same time, structural and façade loading studies were carried out for the roof and envelope. CASE STUDIES SAN MAMÉS STADIUM, BILBAO
To derive wind loads, two complementary approaches were adopted. A larger-scale façade model was tested in an aeronautical wind tunnel, with an instrumented fin flanked by neighbours to measure wind load coefficients.
These results were combined with wind speed and turbulence data from the 1:300 atmospheric boundary layer model, which captured variations with height, position, and wind direction. Because the uppermost row projected above the roof and experienced a different wind regime, these fins were instead pressure-tapped directly on the 1:300 model to capture their specific loads. To investigate resonance, a larger-scale model was designed by Professor Tom Wyatt to reproduce scaled bending and torsion modes of the fins and the vibrational behaviour of the ETFE fabric. Testing with and without neighbouring fins produced full-scale RMS displacement estimates across wind speeds and directions. Later, a roof extension was added to reduce wind-driven rain affecting spectators. To support this, CFD simulations were used to explore solutions, validated by wind tunnel testing.
Services provided: • Wind microclimate study • Structural wind loading study • Facade loading & aerodynamic stability study • Wind driven rain study
The complexity increased with a later design iteration. While the stadium’s overall form and orientation remained similar to its predecessor, the roof adopted a sharper outer profile. The façade changed more radically, reimagined as a series of twisted ETFE-clad fins running around the stadium. The uppermost row projected above the roof eaves, creating a distinctive crown. These fins presented two major challenges. First, it was nearly impossible to instrument a 1:300 scale model to capture accurate wind loads. Second, the possibility of aerodynamic excitation and resonance had to be carefully considered. A further requirement was to model the porous façade accurately