Trex® Metal Railings–Cocktail Rail Approved Configurations Installation Instructions
3. R emove deck board from rail. Using a router bit, forstner bit, or something similar, rout out this area to allow deck board to fully set onto top rail. Stair Continuous (Over-the-Post) Cocktail Rail Configurations/ CONTINUED: 6a 6b
4
4. W here the deck board terminates at top of post horizontal deck board, PREDRILL and toenail two approved composite
deck screws into post, being careful to avoid hitting stair bracket.
6. Secure deck board to top rail using required cocktail bracket specific to product line. Ensure there is a cocktail bracket
6c
5
at each end of the rail closest to the post (if installing Signature Mesh or Rod Rail – closest to the vertical), then space remaining cocktail brackets
approximately every 24". Attach cocktail brackets with screws provided. Pre-drilling before attachment is recommended.
5. A ttach boards to top of pressure-treated posts using two approved composite deck screws.
6
Have Questions? 1–800–BUY–TREX
NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com