FC1000E/SF1000E/X1020/L1020: EPA 2020 Certification Report

Assembly of Unit

Please review the parts list and diagrams contained on pages 16-17 of this manual. DOUBLE CHECK TO MAKE SURE YOU HAVE RECEIVED ALL OF THE REQUIRED COMPONENTS. IF YOU FIND THAT THERE IS A PART MISSING, CALL 1-800-875-4788 IMMEDIATELY. PLEASE DO NOT RETURN THE UNIT TO THE STORE OR TO THE DEALER. NOTE: For your convenience your L1020 f urnace has been factory assembled and the electrical control assembly pre-wired.

1. Fasten the right and left side angle brackets to the circulation blower using (4 1⁄4 - 20 bolts and nuts.

1/4 - 20 Bolt

Angle Bracket

1/4 - 20 Nut

2. Line up the blower with the pre-drilled holes on the backside of the furnace and firmly attach with the screws provided.

Blower Assembly

Mounting Screw

6

Made with FlippingBook - professional solution for displaying marketing and sales documents online