INTERTEK/WARNOCK HERSEY AIR FURANCE EMISSIONS AND EFFICIENCY TESTING LABORATORY OPERATING PROCEDURES pg. 1
INTRODUCTION
This document provides a systematic guide for the technician conducting tests to CAN/CSA B415.1-2010 Performance Testing of Solid-Fuel-Burning Heating Appliances. This guide cannot cover every possible contingency that may develop during a particular test program. Many questions that may arise can be answered by a complete understanding of the test protocol and its intent. When in doubt on any detail check with the laboratory manager and be sure you understand the procedures involved. The primary measurements to be obtained are particulate emission data and efficiency data. The technician's duties include the following steps. It is critical that all spaces on the data forms be properly filled in. Each test must be represented by a complete record of what was done and when.
I. APPLIANCE INSPECTION AND SET-UP A. Incoming Inspection B. Unit Set-Up
II. SAMPLING SYSTEMS - SET-UP A. Gas Analysis B. Dilution Tunnel
III.
TEST CONDUCT A. Pre-Test Fuel Load
B. Test Fuel Load C. Unit Start - up D. Test Run
IV.
POST TEST PROCEDURE A. Leak Checks B. Particulate Sample Recovery
V.
TEST EQUIPMENT AND FIGURES
VI.
FUEL HANDLING AND STORAGE
The technician running this test must be familiar with the following documents that are to be kept in the laboratory at all times.
1. 2.
ASTM E2515 CSA B415.1
G:\Hearth\EE - Emissions and Efficiencey\Furnace solid fuel\Lab Procedures for EPA Air Furnaces 11.11.16.doc
Made with FlippingBook - professional solution for displaying marketing and sales documents online