Wake Forest Comprehensive Transportation Plan - Dec. 2021

WAKE FOREST COMPREHENSIVE TRANSPORTATION PLAN

NC 98 & S Main Street Intersection Issue • High accident location.

Short-Term Improvements Widen the northbound S Main Street approach to provide an additional exclusive left-turn lane and an additional through lane. Provide the dual left-turn lanes with at least 400 feet of storage and an appropriate taper. Widen the southbound S Main Street approach with an additional through lane. Provide the existing right- turn lane with 200 feet of additional storage and an appropriate taper. Medium-Term Improvements Preliminary traffic analysis suggests a special study should be conducted to address traffic problem, potentially including converting the intersection to a superstreet intersection or interchange. The NC 98 Corridor Study recommended a quadrant intersection at the location.

NC 98

F E

NC 98

D C B A

AM LOS

NC 98

F E

NC 98

D C B A

PM LOS

Figure 6-3 | NC 98 & S Main Street LOS

88 | Roadways

Made with FlippingBook - professional solution for displaying marketing and sales documents online