RTT Industrial Paint Booths Installation Manual

Introduction 1.1 Introduction

Thank you for purchasing a RTT spray booth. Please read and understand this manual before using your booth and follow all of the safety instructions. Please be sure to keep this manual with your booth at all times. This manual explains the assembly and routine maintenance of the RTT spray booth and covers the following:

>> Open Front Booths - IB >> Open Front Bench Booths - IBB >> Enclosed Industrial Booths - EIB >> Industrial Exhaust Chambers - IBC >> Exhaust Bench - EB

The spray booth itself consists of four major components: paint area, exhaust fan and chamber, product doors and, in some cases, an air makeup unit. A brief description is provided for these and other related items. The text contained in this manual is for current production models. Some instructions and maintenance procedures may not apply to your specific unit. Equipment modifications from original design and specifications are strictly prohibited. Modifications may compromise safe operation of the booth, subjecting users to serious injury or death and may void any remaining warranty. This Operator’s Manual does not replace, nor does its use release , the operator from observing all safety or operating limitations as well as any applicable federal, state, provincial or local regulations. 1.2 Receiving, Unpacking, And Reporting Missing Items Check for damage when receiving and unloading equipment. Note on Bill of Lading “FREIGHT DAMAGE.” Notify the RTT customer service department immediately of any damage. Unpack all items and verify on packing list within ten (10) days of receipt. Notify RTT customer service department of missing items and discrepancies immediately. RTT will not pay for overnight freight on shorted items. If overnight freight is necessary, the buyer shall be accountable for freight costs. For quality control, RTT ' s Shipping Department photographs all items as they are packed. Per company policy, two independent checks are performed to verify each item against the packing list. If RTT determines that the reported shortage was checked off in our records, replacement parts will be shipped AND invoiced accordingly. Items that can be shipped UPS usually take one to three days to receive, depending on distance. Items too large for UPS will ship via common freight. This shipping method typically takes from one to five days to reach the destination.

2

Made with FlippingBook - professional solution for displaying marketing and sales documents online