Process 2(b) – Wall Assembly (Ovens WITH Internal Support Structure)
Step 1 - Erecting the internal support structure a) Using the Drawing Packet supplied with the oven, locate the positioning of the vertical columns. b) The columns will need to positioned in the exact location required and the back of the column will rest against the inside of the base channel. c) Anchor the columns to the floor with 4-1/2” x ½” wedge anchors (not supplied). d) Attach the horizontal beams to the columns per the drawing packet with the supplied ½” hardware. e) The T-7 trim will need to be welded to the top of the beams for the side wall and end wall connections. Reference Figure 6 > Ensure that the columns are plumb before welding the T-7 to the beams > The T-7 trim may need to be cut to length depending on the oven sizing Step 2 - Preparing the insulated panels to be erected a) Insulating the panel channels > Fill the male side of the panel with the 2” strip insulation as well as the top and bottom channel > DO NOT insulate the female channel at this time Step 3 - Erect the first panel located at the corner that is a Female – Female configuration (See Drawing Packet for Item Number) a) Once panel is vertical and in the correct position apply two stitch screws through the cap channel thru-holes to the bottom of the panel to secure it into place > Ensure that the panel is plumb before fastening b) Apply a 3/8” bead of cement to top of the panel where it will connect to the T-7 trim before fastening to the top of the panel with stitch screws Step 4 - Before the next panel can be installed a bead of cement will need to be applied to the inside of the female channel. Reference Figure 3 Step 5 - Repeat the above steps until all of the wall panels have been erected NOTE: Ensure that the panels ar e plumb aft er installing each one and that they are resting completely down inside of the base channel.
21
Made with FlippingBook - professional solution for displaying marketing and sales documents online