5. DEVELOPMENT POTENTIAL

5.1 The site has the potential to accommodate a new build dwelling to the side of the

existing property (no. 41 Pool Road).

5.2 The Council operates a Community Infrastructure Levy, therefore any new

residential floorspace will be subject to a charge (see CIL Charging Schedule and

the CIL and S106 SPD, adopted March 2015), payable upon commencement of the

development.

5.3 Policy compliant car parking, on-site, will be required (1 space per 1 bed; 1.5 spaces

per 2 bed; 2 spaces per 3 or 4 bed; and 3 spaces per 5+ bed). Garages can count

towards the parking provision but only where they comply with the size requirements

in PSP16 (see also the Residential Parking Standards SPD). Visitor parking spaces are

required for schemes proposing five or more dwellings.

5.4 Secure and fully enclosed cycle storage in a convenient/accessible location will

also be required. Garages that comply with the size requirements in PSP16 can be

used for cycle parking.

5.5 The scheme will be need to comply with the Nationally Described Space Standard

(Technical Housing Standards); and local policy requirements relating to external

amenity space (Policy PSP43 refers); and refuse/recycling storage, see criterion 10

of Policy CS1 and the adopted waste supplementary planning document, to be

found at https://www.southglos.gov.uk/documents/Waste-SPD-Feb-2015.pdf.

5.6 Any new build dwelling is likely to be restricted to three bedrooms, due to the space

available and need for the development to sit appropriately within the street-scene,

and the policy requirements relating to car parking, and internal and external

space standards.

5.7 There is an established front building line along Pool Road therefore any new

dwelling should respect this (i.e. do not project the building beyond it). The rear

building line should also be respected in order to avoid any impacts upon

neighbouring amenity (see the adopted Design Checklist SPD for detailed

guidance that will need to be considered in the design of any scheme).