PSS Studies

Project introduction

1. Elquator Energetic Mechanism Sdn Bhd 2. 30 MW at Segamat, Johor 3. Small hydro electric power plant (SHEP) 4. Direct to JMTH132

5. Expected COD by December 2024 6. KOM conducted – 03 rd Sept 2019 7. Presentation to SHEP Committee – 17 th Sept 2019