Wake County Hazard Mitigation Plan - Adopted 10-21-2024

SECTION 7: MITIGATION ACTION PLANS

Table 7.7 – Mitigation Action Plan, Town of Holly Springs

Town of Holly Springs

Potential Funding Sources

Hazard(s) Addressed

Relative Priority

Lead Agency/ Department

Estimated Cost

Implementation Schedule

2024 Status

Action #

Description

Goal Objective

Status Comments/Explanation

Prevention

Vision Holly Springs Comprehensive Plan - The Town has an existing Comprehensive Plan which includes Land Use, Parks and Recreation, Public Safety, Economic Development, Transportation, Public Utilities and Environment. This plan includes past and current conditions and sets goals for future needs of the Town. The Hazard Mitigation Plan will be incorporated as an additional component of the CGP at plan update. Implement Floodplain Development Regulations related to participating in the National Flood Insurance Program Water Emergency Response Plan - Develop Water Emergency Response Plan in accordance with EPA mandate with wastewater emergency plan developed voluntarily. Building Acquisition and Clearance - The Town is willing to develop a plan designed to utilize Federal grant resources to assist private property owners in purchasing properties located in flood hazard zones.

Holly Springs Planning & Zoning

In-Progress – Carry Forward

Last update occurred in 2021. The Holly Springs Comprehensive Plan is a fluid plan that will be updated and changed continually.

To be determined

P-1

4

2

All

Moderate

Local

1 year

Not Started – Carry Forward

Holly Springs Engineering

On-going process that will need to be changed as circumstances and regulations change.

P-2

4

1

Flood

High

Staff time

Local

2-3 years

Holly Springs Public Utilities, Engineering

In-Progress – Carry Forward

With the development of the wastewater filtration facility expansion, current plans need reviews and revisions to include Sanford facility. Will be deleted on next update.

To be determined

P-3

3

2

All

High

Local

3-5 years

Property Protection

Staff time; acquisition costs TBD on case by case basis

Not Started – Carry Forward Not Started – Carry Forward Not Started – Carry Forward

Holly Springs Code Enforcement

Local, State, Federal

Target for development of plan to enable this activity is now 5-10 year implementation. Carry forward until funding needs are met.

PP-1

3

2

Flood

Low

2-3 years

Staff time; relocation

Building Relocation - The Town is willing to develop a plan designed to utilize Federal grant resources to assist private property owners in relocating existing structures out of flood hazard zones. 3 Building Retrofit - The Town is willing to develop a plan to utilize Federal grant resources to assist private

Holly Springs Code Enforcement

Local, State, Federal

Target for development of plan to enable this activity is now 5-10 year implementation. Carry forward until funding needs are met.

PP-2

2

Flood

Low

costs TBD on case by case basis Staff time; retrofitting costs TBD on case by case basis

2-3 years

Holly Springs Code Enforcement

Local, State, Federal

Target for development of plan to enable this activity is now 5-10 year implementation. Carry forward until funding needs are met.

PP-3

property owners in renovating and retrofitting existing structures in flood hazard zones to reduce vulnerability to flooding damage.

3

2

Flood

Low

2-3 years

Wake County, NC Multi-Jurisdictional Hazard Mitigation Plan

WSP June 2024 Page 319