Purchase of Open Space, Parks and Greenways – As part of new residential development, the Town collects dedicated open space and parkland, or fees- in-lieu of dedication to then purchase land in accordance with Town of Ordinance requirements and Comprehensive Planning documents. The Town also works with Wake County and other agencies to find other funding for open space acquisition. Once

Holly Springs Parks and Recreation

County & State Agencies

In-Progress – Carry Forward

More than 5 years

This is an ongoing goal to create open space, parks, and greenways in pace with the growth of the community

PP-4

4

2

Flood

Moderate

Land Cost

funds are obtained the Town will acquire land consistent with Land Use and Master Open Space Plans. Backup Power to Fire and Police Stations – The Town provides backup power to all fire and police stations. Fire Station 1 – backup power provided by a grant; backup power to Fire Station 2 and Fire Station 3 and Police Station provided by local funds. 3

Requires new facility. Cost unknown at this time.

In-Progress – Carry Forward

The new station is under construction, and we are finalizing contract with generator specifications. Will be completed by next update. The Town currently has an emergency generator to provide power to the Front Office of the Public Works Building during emergencies. The building personnel are getting relocated to a new facility. That facility is slated to be built in the next few years. Still in the planning phase and this new facility will include a generator. We have 3 new lift stations with 1 at a new fire station that are not built yet and do not have generators. Carry forward until stations are complete with generators. Will be deleted on next update. One existing pump station located in the SFHA is incompatible with newer lines and repeatedly failing, causing the release of wastewater into the floodplain and requiring costly response and cleanup. Construction of this Regional Pump Station will reduce wastewater flowing to this station and two others that flow to it, alleviating capacity concerns, reducing future flood damages, and reducing infrastructure upgrades in flood prone areas.

Holly Springs Public Safety

Local, Federal

PP-5

1

All

High

3-5 Years

In-Progress – Carry Forward

Holly Springs Public Works

To be determined

PP-6 Emergency Generator for Public Works Building

3

1

All

Moderate

Local

3-5 Years

In-Progress – Carry Forward

Holly Springs Public Utilities

To be determined

PP-7 Install additional Generators

3

1

All

High

Local

1 year

Build a Regional Pump Station to alleviate capacity concerns, reduce flood damages, and avoid infrastructure investments in older existing pump stations that are located in moderate and high flood risk areas.

Holly Springs Utilities and Infrastructure

Local, Federal

PP-8

3

2

All

High

$8 million

5 years

New

Natural Resource Protection

Holly Springs Utilities and Infrastructure

Restore bank stability and floodplain on Middle Creek.

Grant, Local

The Town is pursuing a Water Resources Development (WRD) grant to implement this project.

NRP-1

3

2

Flood

High

$250,000

2-3 years

New

Structural Projects

The Town is in the process of pursuing options to improve the existing spillway or create a secondary spillway. Per an agreement with NC Dam Safety, this will be completed within the next 5 years.

Holly Springs Engineering, Parks & Recreation

In-Progress – Carry Forward

Flood, Dam Failure

Over $100,000

This project is in design, it was delayed due to dispute between FEMA/Dam safety

S-1

3

2

High

Local

3-5 years

Wake County, NC Multi-Jurisdictional Hazard Mitigation Plan

WSP June 2024 Page 320