Wake County Hazard Mitigation Plan - Adopted 10-21-2024

ANNEX M: TOWN OF ZEBULON

M. TOWN OF ZEBULON

M.1 RISK ASSESSMENT This section contains an inventory of critical facilities at risk within the planning area of the Town of Zebulon. Additionally, hazard risk and vulnerability details are provided for those hazards that are spatially defined and have variations in risk that could be evaluated quantitatively on a jurisdictional level within the Town of Zebulon. The hazards included in this section are: Dam Failure, Flood, and Wildfire. M.1.1 CRITICAL FACILITIES Wake County and the HMPC provided a local inventory of critical facilities and community lifelines, which are a priority for mitigation planning and emergency management. Lifelines are the most fundamental services in the community that, when stabilized, enable all other aspects of society to function. Table M.1 provides a count of critical facilities by FEMA lifeline category within the Town of Zebulon. Figure M.1 shows the locations of all critical facilities within the Town of Zebulon. Table M.1 – Critical Facilities by Type, Town of Zebulon

Facility Type

Count of Facility Type

Structure Value

Communications

1

$0

Energy

13

$7,965,769 $30,497,105 $119,786,882 $6,485,914 $36,683,708

Food, Hydration, Shelter Hazardous Materials

6

35

Health and Medical Safety and Security

6 6 0 6

Transportation Water Systems

$0

$25,223

Total

73

$201,444,601

Source: Wake County, HMPC

Wake County, NC Multi-Jurisdictional Hazard Mitigation Plan

WSP June 2024 Page 543

Made with FlippingBook interactive PDF creator